AIRLINK 75.25 Decreased By ▼ -0.18 (-0.24%)
BOP 5.11 Increased By ▲ 0.04 (0.79%)
CNERGY 4.60 Decreased By ▼ -0.15 (-3.16%)
DFML 32.53 Increased By ▲ 2.43 (8.07%)
DGKC 90.35 Decreased By ▼ -0.13 (-0.14%)
FCCL 22.98 Increased By ▲ 0.08 (0.35%)
FFBL 33.57 Increased By ▲ 0.62 (1.88%)
FFL 10.04 Decreased By ▼ -0.01 (-0.1%)
GGL 11.05 Decreased By ▼ -0.29 (-2.56%)
HBL 114.90 Increased By ▲ 1.41 (1.24%)
HUBC 137.34 Increased By ▲ 0.83 (0.61%)
HUMNL 9.53 Decreased By ▼ -0.37 (-3.74%)
KEL 4.66 No Change ▼ 0.00 (0%)
KOSM 4.70 Increased By ▲ 0.01 (0.21%)
MLCF 40.54 Decreased By ▼ -0.56 (-1.36%)
OGDC 139.75 Increased By ▲ 4.95 (3.67%)
PAEL 27.65 Increased By ▲ 0.04 (0.14%)
PIAA 24.40 Decreased By ▼ -1.07 (-4.2%)
PIBTL 6.92 No Change ▼ 0.00 (0%)
PPL 125.30 Increased By ▲ 0.85 (0.68%)
PRL 27.55 Increased By ▲ 0.15 (0.55%)
PTC 14.15 Decreased By ▼ -0.35 (-2.41%)
SEARL 61.85 Increased By ▲ 1.65 (2.74%)
SNGP 72.98 Increased By ▲ 2.43 (3.44%)
SSGC 10.59 Increased By ▲ 0.03 (0.28%)
TELE 8.78 Decreased By ▼ -0.11 (-1.24%)
TPLP 11.73 Decreased By ▼ -0.05 (-0.42%)
TRG 66.60 Decreased By ▼ -1.06 (-1.57%)
UNITY 25.15 Decreased By ▼ -0.02 (-0.08%)
WTL 1.44 Decreased By ▼ -0.04 (-2.7%)
BR100 7,806 Increased By 81.8 (1.06%)
BR30 25,828 Increased By 227.1 (0.89%)
KSE100 74,531 Increased By 732.1 (0.99%)
KSE30 23,954 Increased By 330.7 (1.4%)
Business & Finance

Pakistan has requested Iran to normalise power supply to Balochistan: Hammad Azhar

  • Balochistan coastal areas are not connected to the national grid and dependent on Iranian power supply, says energy minister
Published July 29, 2021

Minister for Energy Hammad Azhar said on Thursday that the Pakistani authorities have requested the Iranian government to normalise its power supply situation, amid load shedding in Balochistan’s coastal region.

In a series of tweets on Thursday, the federal minister informed that power shortfalls in Iran have led to load shedding in Pakistan’s Gwadar, Turbat and Makraan regions.

“These areas are not connected to the national grid and dependent on Iranian power supply,” said Azhar. The federal minister added that they have taken up the issue with its neighbour and requested them to normalise the power supply.

The port city of Gwadar is a vital cog in the multi-billion dollar China-Pakistan Economic Corridor (CPEC), a $65 billion investment plan aiming to link western China to the southern Pakistani port of Gwadar.

Iran has been hit by severe water shortages in recent weeks, which has led to outages in areas supplied power by hydroelectric plants.

PC shows willingness to share power SPA

Meanwhile, Azhar said that work is also in progress on connecting these areas with the national grid. “This involves laying transmission lines for hundreds of kilometers. This project will be completed within two years,” said Azhar.

Azhar in a meeting with the Iranian ambassador informed that the power outage in some areas of Balochistan is due to power shortfall in Iran.

The Energy Minister urged to restore power supply to Balochistan as soon as possible. The Iranian envoy assured the minister of speedy restoration of power.

On Wednesday, the Secretary Power and CEO Qesco informed the Senate Standing Committee on Power committee that Iran is not supplying 100MW electricity as per the agreement as it is also facing load shedding these days.

Comments

Comments are closed.