BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
World

Suez Canal starts dredging work to extend double lane

  • The SCA announced this week that it was planning to extend a second canal lane that opened in 2015 by 10 km to make it 82 km long, and would widen and deepen a single lane stretch at the southern end of the canal.
  • The work had begun following directives from Egyptian President Abdel Fattah al-Sisi "to immediately start implementing the proposed development plan and put in place a timetable for completion as soon as possible".
Published Updated
By

CAIRO: The Suez Canal Authority (SCA) has started dredging work to extend a second lane that allows for two-way traffic in a southern section of the canal near to where a giant container ship got stuck for six days in March, it said on Saturday.

The SCA announced this week that it was planning to extend a second canal lane that opened in 2015 by 10 km to make it 82 km long, and would widen and deepen a single lane stretch at the southern end of the canal.

The work had begun following directives from Egyptian President Abdel Fattah al-Sisi "to immediately start implementing the proposed development plan and put in place a timetable for completion as soon as possible", the SCA said on Saturday.

The grounding of the 440-metre Ever Given container ship in a southern section of the canal from March 23-29 delayed the passage of hundreds of vessels through the waterway, disrupting global trade.

The Ever Given, still loaded with thousands of containers, is being held in the Great Bitter Lake between two stretches of the canal, amid a dispute over an SCA compensation claim against the ship's Japanese owner Shoei Kisen.

Comments

Comments are closed for this article.