AIRLINK 72.55 Increased By ▲ 3.35 (4.84%)
BOP 5.03 Increased By ▲ 0.13 (2.65%)
CNERGY 4.30 Increased By ▲ 0.04 (0.94%)
DFML 31.95 Increased By ▲ 0.70 (2.24%)
DGKC 80.40 Increased By ▲ 3.15 (4.08%)
FCCL 21.10 Increased By ▲ 1.10 (5.5%)
FFBL 34.78 Decreased By ▼ -0.22 (-0.63%)
FFL 9.35 Increased By ▲ 0.23 (2.52%)
GGL 9.85 Increased By ▲ 0.05 (0.51%)
HBL 113.65 Increased By ▲ 0.89 (0.79%)
HUBC 134.47 Increased By ▲ 1.43 (1.07%)
HUMNL 7.01 Increased By ▲ 0.06 (0.86%)
KEL 4.30 Increased By ▲ 0.07 (1.65%)
KOSM 4.39 Increased By ▲ 0.14 (3.29%)
MLCF 37.34 Increased By ▲ 0.74 (2.02%)
OGDC 134.64 Increased By ▲ 1.77 (1.33%)
PAEL 24.02 Increased By ▲ 1.38 (6.1%)
PIAA 24.80 Increased By ▲ 0.60 (2.48%)
PIBTL 6.55 Increased By ▲ 0.09 (1.39%)
PPL 119.81 Increased By ▲ 3.51 (3.02%)
PRL 26.52 Increased By ▲ 0.62 (2.39%)
PTC 13.27 Increased By ▲ 0.19 (1.45%)
SEARL 52.84 Increased By ▲ 0.84 (1.62%)
SNGP 71.20 Increased By ▲ 3.60 (5.33%)
SSGC 10.64 Increased By ▲ 0.10 (0.95%)
TELE 8.48 Increased By ▲ 0.20 (2.42%)
TPLP 11.15 Increased By ▲ 0.35 (3.24%)
TRG 60.15 Increased By ▲ 0.86 (1.45%)
UNITY 25.23 Increased By ▲ 0.10 (0.4%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,474 Increased By 65.6 (0.89%)
BR30 24,477 Increased By 440.6 (1.83%)
KSE100 71,361 Increased By 694.3 (0.98%)
KSE30 23,396 Increased By 171.7 (0.74%)

PESHAWAR: KP Chief Minister Mahmood Khan Friday decided to hold ground breaking of the 300 megawatt Balakot Hydro Power Project and directed the authorities of Energy and Power Department to finalize all preparations and arrangements. He said, the ground breaking of the mega project is expected to be performed by Prime Minister, Imran Khan.

The decision was taken during a review meeting regarding preparations and arrangements made in connections with ground breaking of Blakot Hydro Power Project at Chief Minister’s Secretariat here.

Advisor to Chief Minister for Energy and Power Himayat Ullah Khan, Principal Secretary to Chief Minister Shahab Ali Shah, Secretary Energy and Power Zubair Khan, Chief Executive Officer PEDO and other relevant high ups attended the meeting.

The Chief Minister was briefed about the progress so far made on the said project and it was told that contract of project had been awarded while contract agreement would soon be signed with the contractor. The 300 Mega Watt Power project is being set up on Kunhar River in Mansehra district with the assistance of Asian Development Bank with an estimated cost of Rs. 85.00 billion.

Copyright Business Recorder, 2021

Comments

Comments are closed.