AIRLINK 69.92 Increased By ▲ 4.72 (7.24%)
BOP 5.46 Decreased By ▼ -0.11 (-1.97%)
CNERGY 4.50 Decreased By ▼ -0.06 (-1.32%)
DFML 25.71 Increased By ▲ 1.19 (4.85%)
DGKC 69.85 Decreased By ▼ -0.11 (-0.16%)
FCCL 20.02 Decreased By ▼ -0.28 (-1.38%)
FFBL 30.69 Increased By ▲ 1.58 (5.43%)
FFL 9.75 Decreased By ▼ -0.08 (-0.81%)
GGL 10.12 Increased By ▲ 0.11 (1.1%)
HBL 114.90 Increased By ▲ 0.65 (0.57%)
HUBC 132.10 Increased By ▲ 3.00 (2.32%)
HUMNL 6.73 Increased By ▲ 0.02 (0.3%)
KEL 4.44 No Change ▼ 0.00 (0%)
KOSM 4.93 Increased By ▲ 0.04 (0.82%)
MLCF 36.45 Decreased By ▼ -0.55 (-1.49%)
OGDC 133.90 Increased By ▲ 1.60 (1.21%)
PAEL 22.50 Decreased By ▼ -0.04 (-0.18%)
PIAA 25.39 Decreased By ▼ -0.50 (-1.93%)
PIBTL 6.61 Increased By ▲ 0.01 (0.15%)
PPL 113.20 Increased By ▲ 0.35 (0.31%)
PRL 30.12 Increased By ▲ 0.71 (2.41%)
PTC 14.70 Decreased By ▼ -0.54 (-3.54%)
SEARL 57.55 Increased By ▲ 0.52 (0.91%)
SNGP 66.60 Increased By ▲ 0.15 (0.23%)
SSGC 10.99 Increased By ▲ 0.01 (0.09%)
TELE 8.77 Decreased By ▼ -0.03 (-0.34%)
TPLP 11.51 Decreased By ▼ -0.19 (-1.62%)
TRG 68.61 Decreased By ▼ -0.01 (-0.01%)
UNITY 23.47 Increased By ▲ 0.07 (0.3%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 7,394 Increased By 99.2 (1.36%)
BR30 24,121 Increased By 266.7 (1.12%)
KSE100 70,910 Increased By 619.8 (0.88%)
KSE30 23,377 Increased By 205.6 (0.89%)

PESHAWAR: KP Chief Minister Mahmood Khan Friday decided to hold ground breaking of the 300 megawatt Balakot Hydro Power Project and directed the authorities of Energy and Power Department to finalize all preparations and arrangements. He said, the ground breaking of the mega project is expected to be performed by Prime Minister, Imran Khan.

The decision was taken during a review meeting regarding preparations and arrangements made in connections with ground breaking of Blakot Hydro Power Project at Chief Minister’s Secretariat here.

Advisor to Chief Minister for Energy and Power Himayat Ullah Khan, Principal Secretary to Chief Minister Shahab Ali Shah, Secretary Energy and Power Zubair Khan, Chief Executive Officer PEDO and other relevant high ups attended the meeting.

The Chief Minister was briefed about the progress so far made on the said project and it was told that contract of project had been awarded while contract agreement would soon be signed with the contractor. The 300 Mega Watt Power project is being set up on Kunhar River in Mansehra district with the assistance of Asian Development Bank with an estimated cost of Rs. 85.00 billion.

Copyright Business Recorder, 2021

Comments

Comments are closed.