AIRLINK 73.18 Increased By ▲ 0.38 (0.52%)
BOP 5.00 Decreased By ▼ -0.06 (-1.19%)
CNERGY 4.37 Increased By ▲ 0.04 (0.92%)
DFML 29.95 Decreased By ▼ -0.57 (-1.87%)
DGKC 91.39 Increased By ▲ 5.44 (6.33%)
FCCL 23.15 Increased By ▲ 0.80 (3.58%)
FFBL 33.50 Increased By ▲ 0.28 (0.84%)
FFL 9.92 Increased By ▲ 0.14 (1.43%)
GGL 10.35 Decreased By ▼ -0.05 (-0.48%)
HBL 113.01 Decreased By ▼ -0.61 (-0.54%)
HUBC 136.28 Increased By ▲ 0.08 (0.06%)
HUMNL 9.60 Decreased By ▼ -0.43 (-4.29%)
KEL 4.78 Increased By ▲ 0.12 (2.58%)
KOSM 4.72 Increased By ▲ 0.32 (7.27%)
MLCF 39.89 Increased By ▲ 1.54 (4.02%)
OGDC 133.90 Increased By ▲ 0.50 (0.37%)
PAEL 28.85 Increased By ▲ 1.45 (5.29%)
PIAA 25.00 Increased By ▲ 0.24 (0.97%)
PIBTL 6.94 Increased By ▲ 0.39 (5.95%)
PPL 122.40 Increased By ▲ 1.19 (0.98%)
PRL 27.40 Increased By ▲ 0.25 (0.92%)
PTC 14.80 Increased By ▲ 0.91 (6.55%)
SEARL 60.40 No Change ▼ 0.00 (0%)
SNGP 70.29 Increased By ▲ 1.76 (2.57%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 8.85 Decreased By ▼ -0.20 (-2.21%)
TPLP 11.32 Increased By ▲ 0.06 (0.53%)
TRG 66.57 Increased By ▲ 0.87 (1.32%)
UNITY 25.20 Decreased By ▼ -0.05 (-0.2%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,674 Increased By 40.1 (0.53%)
BR30 25,457 Increased By 285.1 (1.13%)
KSE100 73,086 Increased By 427.5 (0.59%)
KSE30 23,427 Increased By 44.5 (0.19%)
Pakistan Print 2020-12-31

Korangi, Nazimabad: KE removes illegal kunda connections

KARACHI: K-Electric (KE) continued its drive against illegal connections across Karachi. In Korangi, KE...
Published December 31, 2020

KARACHI: K-Electric (KE) continued its drive against illegal connections across Karachi.

In Korangi, KE successfully removed over 2,000 illegal hook connections from KDA Employees Society. An illegal underground network was also dismantled which was used for water boring from Jalalabad in Nazimabad.

The illegal connections, or kundas, weighing 1,700 kilograms, were taken down despite resistance from the local kunda mafia. The un-permitted connections, which are hazardous and pose a danger to the surrounding area, were placed onto Aerial Bundled Cables (ABC) located within the industrial area of Korangi.

In a separate drive in Jalalabad, located in Nazimabad, KE teams removed illegal underground and overhead cables weighing 232 kilograms, along with unauthorized electrical equipment. Approximately 62 kW electrical loads were used for illegal water boring in the area. Notices have been served to the culprits involved. According to KE spokesperson, “Illegal connections and encroachments around power infrastructure are major public safety hazards.” —PR

Copyright Business Recorder, 2020

Comments

Comments are closed.