AIRLINK 74.29 Increased By ▲ 0.29 (0.39%)
BOP 4.95 Decreased By ▼ -0.07 (-1.39%)
CNERGY 4.37 Decreased By ▼ -0.05 (-1.13%)
DFML 38.80 Decreased By ▼ -0.40 (-1.02%)
DGKC 84.82 Decreased By ▼ -1.27 (-1.48%)
FCCL 21.21 Decreased By ▼ -0.44 (-2.03%)
FFBL 34.12 Increased By ▲ 0.11 (0.32%)
FFL 9.70 Decreased By ▼ -0.22 (-2.22%)
GGL 10.42 Decreased By ▼ -0.14 (-1.33%)
HBL 113.00 Decreased By ▼ -0.89 (-0.78%)
HUBC 136.20 Increased By ▲ 0.36 (0.27%)
HUMNL 11.90 No Change ▼ 0.00 (0%)
KEL 4.71 Decreased By ▼ -0.13 (-2.69%)
KOSM 4.44 Decreased By ▼ -0.09 (-1.99%)
MLCF 37.65 Decreased By ▼ -0.62 (-1.62%)
OGDC 136.20 Increased By ▲ 1.35 (1%)
PAEL 25.10 Decreased By ▼ -1.25 (-4.74%)
PIAA 19.24 Decreased By ▼ -1.56 (-7.5%)
PIBTL 6.71 Increased By ▲ 0.03 (0.45%)
PPL 122.10 Decreased By ▼ -0.90 (-0.73%)
PRL 26.65 Decreased By ▼ -0.04 (-0.15%)
PTC 13.93 Decreased By ▼ -0.40 (-2.79%)
SEARL 57.22 Decreased By ▼ -1.90 (-3.21%)
SNGP 67.60 Decreased By ▼ -1.90 (-2.73%)
SSGC 10.25 Decreased By ▼ -0.08 (-0.77%)
TELE 8.40 Decreased By ▼ -0.10 (-1.18%)
TPLP 11.13 Decreased By ▼ -0.10 (-0.89%)
TRG 62.81 Decreased By ▼ -2.04 (-3.15%)
UNITY 26.50 Increased By ▲ 0.25 (0.95%)
WTL 1.35 Increased By ▲ 0.01 (0.75%)
BR100 7,810 Decreased By -40.3 (-0.51%)
BR30 25,150 Decreased By -186.4 (-0.74%)
KSE100 74,957 Decreased By -250.1 (-0.33%)
KSE30 24,083 Decreased By -59.5 (-0.25%)

STOCKHOLM: Cavotec's automated mooring technology, MoorMasterTM, has been selected by Australian mining company, Karara Mining Ltd., for use at their dedicated iron ore handling facility at the Port of Geraldton in Western Australia.

"Safety and sea conditions are the two major considerations with this project; issues that MoorMasterTM is uniquely equipped to handle. Cavotec looks forward to working closely with Karara to ensure the successful execution of this project," says Cavotec CEO, Ottonel Popesco.

Karara Mining Ltd. has ordered 12 MoorMasterTM MM200D units, for use at their dedicated bulk handling facility at the Port of Geraldton to minimise the serious safety risk of mooring lines parting. All MoorMasterTM MM200D units are specially designed for use at bulk terminals.

Situated some 400km north of Perth, the Port of Geraldton is one of Australia's busiest regional ports. The Port has historically been one of Australia's larger grain export ports and today, more than half the port's exports are generated from minerals and iron ore.

MoorMasterTM is a vacuum-based automated mooring technology that eliminates the need for conventional mooring lines. Remote controlled vacuum pads recessed in, or mounted on, the quayside, moor and release vessels in seconds. The system offers improved safety, improved operational efficiency and the potential for infrastructure savings.

MoorMasterTM is also in use at two other bulk handling applications in Western Australia. Fourteen MoorMasterTM MM200B units have recently been commissioned at the Port Hedland Port Authority, and Cavotec has recently delivered eight MM200D units to Hamersley Iron Pty Ltd, a subsidiary of Anglo-Australian mining group Rio Tinto, for the Dampier Fuel Supply Wharf in the Port of Dampier.

MoorMasterTM is an increasingly accepted and widely adopted technology that has performed more than 40,000 mooring operations, with a 100% safety record, at ferry, bulk handling, Ro-Ro, container and lock applications around the world.

Cavotec is a leading global engineering group, developing innovative technologies that enable the maritime, airports; mining and tunnelling, and general industry sectors operate more sustainably.

Copyright AFP (Agence France-Presse), 2011

Comments

Comments are closed.