AIRLINK 74.00 Decreased By ▼ -0.56 (-0.75%)
BOP 5.02 Decreased By ▼ -0.04 (-0.79%)
CNERGY 4.42 Decreased By ▼ -0.04 (-0.9%)
DFML 39.20 Decreased By ▼ -0.53 (-1.33%)
DGKC 86.09 Decreased By ▼ -1.46 (-1.67%)
FCCL 21.65 Decreased By ▼ -0.28 (-1.28%)
FFBL 34.01 Decreased By ▼ -0.58 (-1.68%)
FFL 9.92 Increased By ▲ 0.17 (1.74%)
GGL 10.56 Increased By ▲ 0.07 (0.67%)
HBL 113.89 Increased By ▲ 0.10 (0.09%)
HUBC 135.84 Decreased By ▼ -0.68 (-0.5%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.84 Increased By ▲ 0.17 (3.64%)
KOSM 4.53 Decreased By ▼ -0.11 (-2.37%)
MLCF 38.27 Decreased By ▼ -0.19 (-0.49%)
OGDC 134.85 Decreased By ▼ -1.29 (-0.95%)
PAEL 26.35 Decreased By ▼ -0.26 (-0.98%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.68 Increased By ▲ 0.01 (0.15%)
PPL 123.00 Increased By ▲ 0.71 (0.58%)
PRL 26.69 Decreased By ▼ -0.28 (-1.04%)
PTC 14.33 Increased By ▲ 0.42 (3.02%)
SEARL 59.12 Decreased By ▼ -0.75 (-1.25%)
SNGP 69.50 Decreased By ▼ -0.56 (-0.8%)
SSGC 10.33 Decreased By ▼ -0.02 (-0.19%)
TELE 8.50 Decreased By ▼ -0.04 (-0.47%)
TPLP 11.23 Decreased By ▼ -0.11 (-0.97%)
TRG 64.85 Decreased By ▼ -1.15 (-1.74%)
UNITY 26.25 Decreased By ▼ -0.08 (-0.3%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,842 Increased By 18 (0.23%)
BR30 25,326 Decreased By -79.9 (-0.31%)
KSE100 75,207 Increased By 122.8 (0.16%)
KSE30 24,143 Increased By 49.1 (0.2%)

imageBAHAWALNAGAR: Minister of State for Water and Power Abid Sher Ali has assured cricket fans that there would be no load shedding across the country on the day of Pakistan Super League (PSL) final, on March 5 (Sunday) in Lahore.

The minister made this announcement after inaugurating the 220 KV grid station at Chishtian near Bahawalnagar.

Ali reiterated that the government was committed to eliminate load shedding from the country. Power projects of over 10,000 MW capacity are being completed on fast track basis, added the minister.

The 220 KV grid station Chishtian along with 88 km transmission line has been constructed by National Transmission and Dispatch Company Ltd. (NTDC) with the cost of Rs 2.633 billion.

He appreciated the NTDC Management, engineers and staff for timely completion of the project and said that the grid station will end forced load shedding, improve voltage level and minimize trippings which was being faced due to overloading of the system.

Copyright Business Recorder, 2017

Comments

Comments are closed.