AIRLINK 181.39 Decreased By ▼ -2.38 (-1.3%)
BOP 11.17 Decreased By ▼ -0.09 (-0.8%)
CNERGY 8.54 Increased By ▲ 0.01 (0.12%)
CPHL 94.26 Decreased By ▼ -2.18 (-2.26%)
FCCL 46.18 Increased By ▲ 0.01 (0.02%)
FFL 15.66 Decreased By ▼ -0.09 (-0.57%)
FLYNG 28.18 Decreased By ▼ -0.18 (-0.63%)
HUBC 142.77 Decreased By ▼ -0.67 (-0.47%)
HUMNL 13.24 Increased By ▲ 0.24 (1.85%)
KEL 4.53 Increased By ▲ 0.09 (2.03%)
KOSM 5.79 Increased By ▲ 0.02 (0.35%)
MLCF 65.51 Increased By ▲ 0.94 (1.46%)
OGDC 212.88 Decreased By ▼ -1.20 (-0.56%)
PACE 6.05 Increased By ▲ 0.08 (1.34%)
PAEL 46.60 Decreased By ▼ -0.42 (-0.89%)
PIAHCLA 18.17 Increased By ▲ 1.08 (6.32%)
PIBTL 10.61 Increased By ▲ 0.18 (1.73%)
POWER 12.31 Increased By ▲ 0.19 (1.57%)
PPL 170.90 Decreased By ▼ -0.84 (-0.49%)
PRL 34.27 Decreased By ▼ -0.25 (-0.72%)
PTC 22.86 Increased By ▲ 0.47 (2.1%)
SEARL 94.95 Increased By ▲ 2.04 (2.2%)
SSGC 42.47 Increased By ▲ 1.64 (4.02%)
SYM 14.19 Decreased By ▼ -0.01 (-0.07%)
TELE 7.21 Decreased By ▼ -0.07 (-0.96%)
TPLP 9.91 Decreased By ▼ -0.10 (-1%)
TRG 65.55 Decreased By ▼ -1.10 (-1.65%)
WAVESAPP 9.85 Decreased By ▼ -0.28 (-2.76%)
WTL 1.32 No Change ▼ 0.00 (0%)
YOUW 3.76 Decreased By ▼ -0.03 (-0.79%)
BR100 12,588 Increased By 72.3 (0.58%)
BR30 37,879 Decreased By -72.9 (-0.19%)
KSE100 117,316 Increased By 414.5 (0.35%)
KSE30 36,116 Increased By 183.7 (0.51%)

imageISLAMABAD: The Ministry of Railways will upgrade its existing tracks besides installing new railway tracks from Gwadar-Quetta-Jacobabad via Besima Tehsil in Balochistan, under China-Pak-Economic Corridor (CPEC).

Under the project, a total 560 kilometres track from Bostan-Kotla Jam on the main line-II via Zhob and Dera Ismail Khan and another 682 kilometres track from Havelian to Khunjerab will be laid, a source in the Ministry of Railways told APP.

The upgradation of 1,872 kilometres track from Karachi to Peshawar via Kotri, Multan, Lahore and Rawalpindi (including Taxila- Havelian) - along with dualization of the track from Shahdara to Peshawar will also be carried out.

To enhance connectivity and improve transportation facilities, 1,254 kilometres of railway track from Kotri to Attock City via Dadu, Larkana, Jacobabad, Dera Ghazi Khan, Bhakkar and Kundian will be upgraded.

The CPEC is a 3,000-kilometer network of roads, railways and pipelines to transport oil and gas from Gwadar Port to Kashgar city, Northwestern China's Xinjiang Uygur autonomous region.

An official agreement on the corridor was signed between the two countries in May last year during Chinese President's historic visit to Pakistan.

The project links China's strategy to develop its western region with Pakistan's focus on boosting its economy, including the infrastructure construction of Gwadar Port, together with some energy cooperation and investment programmes.

It also involves road and railway construction including the upgradation of 1,300-km Karakoram Highway, the highest paved international road in the world which connects China and Pakistan across the Karakoram mountains.

The CPEC will reduce China's routes of oil and gas imports from Africa and the Middle East by thousands of kilometers, making Gwadar a potentially vital link in China's supply chain.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.