BR100 Decreased By (-0.26%)
BR30 Decreased By (-0.53%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)
Markets

PPL successfully commissions well after decade-long delay

  • PPL resolves infrastructure issues for commercial viability
Published Updated

After remaining undeveloped for over a decade, Pakistan Petroleum Limited (PPL), an oil and gas exploration firm, has successfully commissioned the Faiz X-1 Deep (Basal Sand) well, located in Sanghar district, Sindh.

The E&P, a key supplier of natural gas in the country, shared the development in a notice to the Pakistan Stock Exchange (PSX) on Friday.

“We, the operator of Gambat South Block, are pleased to announce the successful commissioning of Faiz X-1 Deep (Basal Sand) well,” PPL said in a notice.

The well was drilled in 2014. However, due to the absence of nearby pipeline infrastructure, the development of the discovery could not be undertaken, leaving the project uneconomical, it said.

“Following establishment of connectivity with other wells’ pipeline and a comprehensive technical and economic re-evaluation, the Basal Sand interval was determined to be commercially viable,” said the company, which subsequently undertook well intervention and surface facility works to bring the well into production.

Pakistan Petroleum Limited commissions new exploratory well in Sujawal

PPL shared that commissioning activities included isolation of deeper intervals, execution of well intervention jobs, installation of surface facilities, and construction of approximately 4.5km of feeder line to integrate the well into the existing gas gathering network for onward delivery to the Gambat South Gas Processing Facilities.

The E&P informed that the well was commissioned on 25th February 2026, and production was ramped up in stages.

“It is currently producing approximately 3.6 MMscfd of gas and 750 bpd of condensate following optimisation of operational parameters,” read the notice

As one of the largest exploration and production companies in Pakistan, PPL plays a pivotal role in exploring, prospecting, developing, and producing oil and natural gas resources.

Comments

200 characters remaining