AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,941 Increased By 103.5 (1.32%)
BR30 25,648 Increased By 196 (0.77%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

electicity-polesISLAMABAD: The government is set to complete around half dozen hydel power projects of 381 MW accumulative capacity by the end of this year.

Official sources in WAPDA told APP here Friday that Jinnah (96 MW), Allai Khwar (121 MW), Duber Khwar (130 MW) hydropower projects, Satpara (17 MW) and Gomal Zam dams (17 MW) would be completed by December.

They said that Allai Khwar was located on Allai Khwar River, near Besham District Battagram while Duber Khwar project was being constructed on Khan Khwar River near Pattan District Kohistan.

Jinnah hydropower project is located on the right side of existing Jinnah Barrage, 5 km from Kalabagh town in District Mianwal and according to PC-I it would cost Rs. 13546.8 million with Foreign Exchange Component of Rs. 6608.221 Million.

Satpara dam is being constructed on Satpara Nullah downstream of Satpara Lake with an estimated cost of Rs.4480.021 million.

The project would generate 17.36 MW of hydropower besides irrigating 15.536 acres of land and supply 3.1 million gallons per day drinking water to Skardu city.

Similary, Gomal Zam Dam site (Khajuri Kach) is being constructed on Gomal River in South Waziristan Agency, west of Tank and D.I.Khan Districts of Khyber Pakhtun Khwa (KPK) Province and would cost Rs.12829 million including Rs.4964 FEC.

They said that the project would provide 316,232 Acre-feet of water annually to irrigate about 163,086 acres and generate 17.4 MW cheap hydel electricity.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed.