AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,941 Increased By 103.5 (1.32%)
BR30 25,648 Increased By 196 (0.77%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)
Print Print 2020-03-29

Quarantine centres: Lesco sets up control room

The Lahore Electric Supply Company (LESCO) has set up a control room to monitor uninterrupted electricity supply to quarantine centres in the city. Staff at the control room will perform duty in three shifts.
Published 29 Mar, 2020 12:00am

The Lahore Electric Supply Company (LESCO) has set up a control room to monitor uninterrupted electricity supply to quarantine centres in the city. Staff at the control room will perform duty in three shifts.
LESCO sources told that the Power Ministry has directed to stop load shedding on high losses feeders up to 6th of April. Therefore, an emergency plan is being carried out to keep the power supply intact during this period, they added.
Under the emergency plan, maintenance work has been called off throughout the LESCO region with immediate effect and a ban has been imposed on permission for supply shut down.

Copyright Business Recorder, 2020

Comments

Comments are closed.