AIRLINK 81.10 Increased By ▲ 2.55 (3.25%)
BOP 4.82 Increased By ▲ 0.05 (1.05%)
CNERGY 4.09 Decreased By ▼ -0.07 (-1.68%)
DFML 37.98 Decreased By ▼ -1.31 (-3.33%)
DGKC 93.00 Decreased By ▼ -2.65 (-2.77%)
FCCL 23.84 Decreased By ▼ -0.32 (-1.32%)
FFBL 32.00 Decreased By ▼ -0.77 (-2.35%)
FFL 9.24 Decreased By ▼ -0.13 (-1.39%)
GGL 10.06 Decreased By ▼ -0.09 (-0.89%)
HASCOL 6.65 Increased By ▲ 0.11 (1.68%)
HBL 113.00 Increased By ▲ 3.50 (3.2%)
HUBC 145.70 Increased By ▲ 0.69 (0.48%)
HUMNL 10.54 Decreased By ▼ -0.19 (-1.77%)
KEL 4.62 Decreased By ▼ -0.11 (-2.33%)
KOSM 4.12 Decreased By ▼ -0.14 (-3.29%)
MLCF 38.25 Decreased By ▼ -1.15 (-2.92%)
OGDC 131.70 Increased By ▲ 2.45 (1.9%)
PAEL 24.89 Decreased By ▼ -0.98 (-3.79%)
PIBTL 6.25 Decreased By ▼ -0.09 (-1.42%)
PPL 120.00 Decreased By ▼ -2.70 (-2.2%)
PRL 23.90 Decreased By ▼ -0.45 (-1.85%)
PTC 12.10 Decreased By ▼ -0.89 (-6.85%)
SEARL 59.95 Decreased By ▼ -1.23 (-2.01%)
SNGP 65.50 Increased By ▲ 0.30 (0.46%)
SSGC 10.15 Increased By ▲ 0.26 (2.63%)
TELE 7.85 Decreased By ▼ -0.01 (-0.13%)
TPLP 9.87 Increased By ▲ 0.02 (0.2%)
TRG 64.45 Decreased By ▼ -0.05 (-0.08%)
UNITY 26.90 Decreased By ▼ -0.09 (-0.33%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
BR100 8,052 Increased By 75.9 (0.95%)
BR30 25,581 Decreased By -21.4 (-0.08%)
KSE100 76,707 Increased By 498.6 (0.65%)
KSE30 24,698 Increased By 260.2 (1.06%)

Wide ranging transfers and postings of officers working in BPS-19,18,17 are made in National Highway Authority (NHA). Such officers remained posted on the same post for a period of 5 to 10 years. The sole objective of these countrywide transfers/postings is to promote good governance and ensure transparency in functioning of the Authority.
The step will also help terminate monopoly of officers who remained posted on the same post for long. To this effect, the NHA has also chalked out policy of maximum three years tenure of posting on same post. These measures will eventually prepare ground to further improve the performance of the authority and timely and quality completion of NHA schemes will be ensured, says a press release issued here on Monday. According to the details, Project Director (KKH) NHA, Gilgit Mehboob Wali Khan is post as general manager (in own pay & scale(OPS) Jaglot-Skardu Road Project while Director Asad Khurshid Malik is posted as GM (OPS) Construction at NHA, Lahore.
Likewise Director (Contract Administration) Muhammad Jehanzeb Mumtaz Khan Niazi is posted as Director (RAMS) NHA, HQ & Director (P&CA) Muhammad Azam is posted Director (Revenue-ROW) NHA, HQ. Director NHA Kallar Kahar Samiullah Chattha is posted as Director (P&CA) NHA, HQ. Deputy Director (Engr) Nand Kumar Soofi is posted as Director (OPS) Design NHA, HQ and Atta-ul-Mohsin DD (Design) is transferred to NHA D.G.Khan office. Aftabullah Babar is posted as Project Director (Western- Corridor, Pindi Gheb to Hakla at NHA Tarnol office. Mariam Mumtaz Butt Director LM&IS is given the look after charge of Director (Resettlement/Social).
Likewise DD Muhammad Azam is posted as Director (OPS) (B&A) at NHA, HQ, while Hafiz Khurram Rashid is posted as Director (Internal Audit) NHA, HQ. Zulfiqar Ahmad Abbasi DD (Finance) NHA, Abbottabad is posted as DD (Accounts) NHA, HQ, and Tariq Hussain Shah is posted as DD Finance NHA, HQ. Irfan Rafique is posted as DD (Accounts) and Irfanullah Jan is posted as DD (Accounts) Motorways NHA, Kallar Kahar. AD (Engr) Rana Muhammad Nadeem is posted as DD (OPS) Design NHA, HQ, Farheen Shafaat is posted as AD (Design) while Farah Bashir is posted as AD (Design-Quantity Surveys) NHA, HQ. Muhammad Rizwan Nayim is posted as AD (RAMS-I), Imtiaz Khan is posted as Deputy Chief Operating Officer (OPS) (Lowari Tunnel), Safeer Ahmed Khan is post as AD (Maint) NHA, Peshawar, Murad Ali Khan AD (Maint) NHA Batkhela, Sehrish Shakeel Syed AD (Maint) Karachi, Niaz Hussain Khawar AD (Maint) Hyderabad, Irfan Ahmad Shaikh is posted as AD (Construction) NHA Sukkur Office.-PR

Copyright Business Recorder, 2019

Comments

Comments are closed.