BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.18%)
KSE30 Decreased By (-0.19%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.16 Increased By ▲ 0.07 (1.38%)
BML 54.55 Decreased By ▼ -0.43 (-0.78%)
BOP 33.11 Increased By ▲ 0.13 (0.39%)
CNERGY 10.41 Increased By ▲ 0.31 (3.07%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.20 Increased By ▲ 0.95 (1.85%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.20 Increased By ▲ 0.14 (1.98%)
KOSM 5.80 Increased By ▲ 0.26 (4.69%)
LOTCHEM 27.14 Decreased By ▼ -1.98 (-6.8%)
MLCF 90.25 Increased By ▲ 1.43 (1.61%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.78 Increased By ▲ 0.76 (1.38%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.88 Increased By ▲ 1.93 (0.62%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.35 Increased By ▲ 0.36 (0.88%)
PIBTL 16.10 Increased By ▲ 0.14 (0.88%)
PPL 213.99 Increased By ▲ 1.33 (0.63%)
PRL 54.20 Increased By ▲ 1.66 (3.16%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.10 No Change ▼ 0.00 (0%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.19 Increased By ▲ 0.44 (2.48%)
TPLP 13.12 Decreased By ▼ -0.10 (-0.76%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.81 Increased By ▲ 2.92 (5.13%)
Pakistan

SSGC completes engineering survey of 21 schemes in Quetta

ISLAMABAD: Sui Southern Gas Company (SSGC) has recently completed a detailed engineering survey of 21 schemes for Qu
Published Updated

ISLAMABAD: Sui Southern Gas Company (SSGC) has recently completed a detailed engineering survey of 21 schemes for Quetta to provide gas connections to consumers in Balochistan.

The company has taken various steps to improve gas transmission network in the province to maintain gas pressure especially in peak winter season, official sources told APP on Tuesday.

Sharing the measures to improve the gas pressure in Quetta city, they said, the Quetta Pipeline Capacity ‘Enhancement Project has been completed that enhanced the overall pipeline capacity from 149 MMCFD to 200 MMCFD for supply of gas to Quetta and surrounding areas.

The sources said installation of a new compressor unit of 200 MMCFD capacity at HQ-Sibi and installation of one standby compressor unit at HQ-Shikarpur will increase pipeline capacity from 200 MMCFD to 226 MMCFD.

In addition, the sources said, the company has designed different reinforcement schemes to redress the low pressure problems across its transmission network in Balochistan and Sindh provinces.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed for this article.