BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
Pakistan

SSGC completes engineering survey of 21 schemes in Quetta

ISLAMABAD: Sui Southern Gas Company (SSGC) has recently completed a detailed engineering survey of 21 schemes for Qu
Published January 15, 2019 Updated January 15, 2019 02:04pm

ISLAMABAD: Sui Southern Gas Company (SSGC) has recently completed a detailed engineering survey of 21 schemes for Quetta to provide gas connections to consumers in Balochistan.

The company has taken various steps to improve gas transmission network in the province to maintain gas pressure especially in peak winter season, official sources told APP on Tuesday.

Sharing the measures to improve the gas pressure in Quetta city, they said, the Quetta Pipeline Capacity ‘Enhancement Project has been completed that enhanced the overall pipeline capacity from 149 MMCFD to 200 MMCFD for supply of gas to Quetta and surrounding areas.

The sources said installation of a new compressor unit of 200 MMCFD capacity at HQ-Sibi and installation of one standby compressor unit at HQ-Shikarpur will increase pipeline capacity from 200 MMCFD to 226 MMCFD.

In addition, the sources said, the company has designed different reinforcement schemes to redress the low pressure problems across its transmission network in Balochistan and Sindh provinces.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed for this article.