BR100 Decreased By (-0.26%)
BR30 Decreased By (-0.16%)
KSE100 Decreased By (-0.23%)
KSE30 Decreased By (-0.23%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.71 Decreased By ▼ -0.27 (-0.49%)
BOP 33.14 Increased By ▲ 0.16 (0.49%)
CNERGY 10.47 Increased By ▲ 0.37 (3.66%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.20 Increased By ▲ 0.95 (1.85%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.20 Increased By ▲ 0.14 (1.98%)
KOSM 5.85 Increased By ▲ 0.31 (5.6%)
LOTCHEM 27.15 Decreased By ▼ -1.97 (-6.77%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 197.00 Decreased By ▼ -0.49 (-0.25%)
NCPL 55.80 Increased By ▲ 0.78 (1.42%)
NPL 65.25 Increased By ▲ 0.37 (0.57%)
OGDC 313.86 Increased By ▲ 1.91 (0.61%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.55 Increased By ▲ 0.56 (1.37%)
PIBTL 16.10 Increased By ▲ 0.14 (0.88%)
PPL 213.77 Increased By ▲ 1.11 (0.52%)
PRL 54.33 Increased By ▲ 1.79 (3.41%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 24.99 Decreased By ▼ -0.11 (-0.44%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.19 Increased By ▲ 0.44 (2.48%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.80 Increased By ▲ 2.91 (5.12%)
Pakistan

New pipelines being installed to provide uninterrupted gas supply

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to en
Published Updated

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to ensure uninterrupted supply of gas in the city.

According to Malik Bashir, the new gas pipeline of 49 kilometers long and 16-inch diameter would replace 11-inch diameter pipeline from Khairpur Daha to Bahawalpur which would help in smooth transmission of gas supply.

He said that with the installation of new pipeline, complaints related to low pressure or load shedding of gas during winter seasons would be overcome.

He informed that 8-inch diameter pipeline is being replaced with 14-inch diameter pipeline from Bhatta No 1 to Lari Adda via Model Town B and Model Town C with a cost of Rs 80 million.

The new pipelines are being installed throughout the city due to which line losses would be mitigated and gas would be supplied with full pressure, he maintained.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.