AIRLINK 78.55 Decreased By ▼ -0.06 (-0.08%)
BOP 4.77 Increased By ▲ 0.12 (2.58%)
CNERGY 4.16 Increased By ▲ 0.13 (3.23%)
DFML 39.29 Increased By ▲ 2.81 (7.7%)
DGKC 95.65 Increased By ▲ 7.40 (8.39%)
FCCL 24.16 Increased By ▲ 1.87 (8.39%)
FFBL 32.77 Increased By ▲ 2.62 (8.69%)
FFL 9.37 Increased By ▲ 0.19 (2.07%)
GGL 10.15 Increased By ▲ 0.23 (2.32%)
HASCOL 6.54 Increased By ▲ 0.43 (7.04%)
HBL 109.50 Increased By ▲ 4.50 (4.29%)
HUBC 145.01 Increased By ▲ 7.51 (5.46%)
HUMNL 10.73 Increased By ▲ 0.08 (0.75%)
KEL 4.73 Increased By ▲ 0.09 (1.94%)
KOSM 4.26 Increased By ▲ 0.26 (6.5%)
MLCF 39.40 Increased By ▲ 2.27 (6.11%)
OGDC 129.25 Increased By ▲ 10.06 (8.44%)
PAEL 25.87 Increased By ▲ 1.89 (7.88%)
PIBTL 6.34 Increased By ▲ 0.27 (4.45%)
PPL 122.70 Increased By ▲ 8.65 (7.58%)
PRL 24.35 Increased By ▲ 1.18 (5.09%)
PTC 12.99 Increased By ▲ 0.79 (6.48%)
SEARL 61.18 Increased By ▲ 2.13 (3.61%)
SNGP 65.20 Increased By ▲ 3.22 (5.2%)
SSGC 9.89 Increased By ▲ 0.13 (1.33%)
TELE 7.86 Increased By ▲ 0.19 (2.48%)
TPLP 9.85 Increased By ▲ 0.37 (3.9%)
TRG 64.50 Increased By ▲ 0.78 (1.22%)
UNITY 26.99 Increased By ▲ 0.14 (0.52%)
WTL 1.32 Increased By ▲ 0.02 (1.54%)
BR100 7,977 Increased By 398.8 (5.26%)
BR30 25,602 Increased By 1383.8 (5.71%)
KSE100 76,208 Increased By 3410.7 (4.69%)
KSE30 24,438 Increased By 1225 (5.28%)

Prime Minister Nawaz Sharif has said overcoming terrorism and electricity shortage is the top priority of the government. He was talking to German Ambassador to Pakistan Dr Cyrill Nunn who called on him in Islamabad on Friday. The Prime Minister lauded German Ambassador for strengthening bilateral relations between the two countries. Meanwhile, it is reported that electricity shortfall has reached at least 4,400MW leading to increased hours of outages countrywide.
At least 12-hour long outages are being carried out in rural while eight-hour long in urban areas. It is reported that the demand of electricity is 19,300MW whereas the production is 14,900MW. The shortfall has reached 4,400MW due to increase in power demand. Besides this, duration of load shedding in areas going through line losses is more than 12 hours.

Copyright News Network International, 2015

Comments

Comments are closed.