AIRLINK 73.95 Decreased By ▼ -0.30 (-0.4%)
BOP 5.11 Increased By ▲ 0.06 (1.19%)
CNERGY 4.43 Increased By ▲ 0.01 (0.23%)
DFML 37.80 Increased By ▲ 1.96 (5.47%)
DGKC 90.42 Increased By ▲ 2.42 (2.75%)
FCCL 22.58 Increased By ▲ 0.38 (1.71%)
FFBL 32.95 Increased By ▲ 0.23 (0.7%)
FFL 9.78 Decreased By ▼ -0.01 (-0.1%)
GGL 10.83 Increased By ▲ 0.03 (0.28%)
HBL 115.82 Decreased By ▼ -0.08 (-0.07%)
HUBC 135.39 Decreased By ▼ -0.45 (-0.33%)
HUMNL 9.84 No Change ▼ 0.00 (0%)
KEL 4.62 Increased By ▲ 0.01 (0.22%)
KOSM 4.76 Increased By ▲ 0.10 (2.15%)
MLCF 40.60 Increased By ▲ 0.72 (1.81%)
OGDC 138.23 Increased By ▲ 0.33 (0.24%)
PAEL 26.55 Increased By ▲ 0.12 (0.45%)
PIAA 26.00 Decreased By ▼ -0.28 (-1.07%)
PIBTL 6.71 Decreased By ▼ -0.05 (-0.74%)
PPL 123.65 Increased By ▲ 0.75 (0.61%)
PRL 26.92 Increased By ▲ 0.23 (0.86%)
PTC 14.05 Increased By ▲ 0.05 (0.36%)
SEARL 59.17 Increased By ▲ 0.47 (0.8%)
SNGP 70.80 Increased By ▲ 0.40 (0.57%)
SSGC 10.40 Increased By ▲ 0.04 (0.39%)
TELE 8.64 Increased By ▲ 0.08 (0.93%)
TPLP 11.25 Decreased By ▼ -0.13 (-1.14%)
TRG 64.45 Increased By ▲ 0.22 (0.34%)
UNITY 26.10 Increased By ▲ 0.05 (0.19%)
WTL 1.37 Decreased By ▼ -0.01 (-0.72%)
BR100 7,858 Increased By 20.3 (0.26%)
BR30 25,554 Increased By 94.7 (0.37%)
KSE100 75,130 Increased By 199.3 (0.27%)
KSE30 24,176 Increased By 30.7 (0.13%)

Prime Minister Nawaz Sharif has said overcoming terrorism and electricity shortage is the top priority of the government. He was talking to German Ambassador to Pakistan Dr Cyrill Nunn who called on him in Islamabad on Friday. The Prime Minister lauded German Ambassador for strengthening bilateral relations between the two countries. Meanwhile, it is reported that electricity shortfall has reached at least 4,400MW leading to increased hours of outages countrywide.
At least 12-hour long outages are being carried out in rural while eight-hour long in urban areas. It is reported that the demand of electricity is 19,300MW whereas the production is 14,900MW. The shortfall has reached 4,400MW due to increase in power demand. Besides this, duration of load shedding in areas going through line losses is more than 12 hours.

Copyright News Network International, 2015

Comments

Comments are closed.