AIRLINK 81.10 Increased By ▲ 2.55 (3.25%)
BOP 4.82 Increased By ▲ 0.05 (1.05%)
CNERGY 4.09 Decreased By ▼ -0.07 (-1.68%)
DFML 37.98 Decreased By ▼ -1.31 (-3.33%)
DGKC 93.00 Decreased By ▼ -2.65 (-2.77%)
FCCL 23.84 Decreased By ▼ -0.32 (-1.32%)
FFBL 32.00 Decreased By ▼ -0.77 (-2.35%)
FFL 9.24 Decreased By ▼ -0.13 (-1.39%)
GGL 10.06 Decreased By ▼ -0.09 (-0.89%)
HASCOL 6.65 Increased By ▲ 0.11 (1.68%)
HBL 113.00 Increased By ▲ 3.50 (3.2%)
HUBC 145.70 Increased By ▲ 0.69 (0.48%)
HUMNL 10.54 Decreased By ▼ -0.19 (-1.77%)
KEL 4.62 Decreased By ▼ -0.11 (-2.33%)
KOSM 4.12 Decreased By ▼ -0.14 (-3.29%)
MLCF 38.25 Decreased By ▼ -1.15 (-2.92%)
OGDC 131.70 Increased By ▲ 2.45 (1.9%)
PAEL 24.89 Decreased By ▼ -0.98 (-3.79%)
PIBTL 6.25 Decreased By ▼ -0.09 (-1.42%)
PPL 120.00 Decreased By ▼ -2.70 (-2.2%)
PRL 23.90 Decreased By ▼ -0.45 (-1.85%)
PTC 12.10 Decreased By ▼ -0.89 (-6.85%)
SEARL 59.95 Decreased By ▼ -1.23 (-2.01%)
SNGP 65.50 Increased By ▲ 0.30 (0.46%)
SSGC 10.15 Increased By ▲ 0.26 (2.63%)
TELE 7.85 Decreased By ▼ -0.01 (-0.13%)
TPLP 9.87 Increased By ▲ 0.02 (0.2%)
TRG 64.45 Decreased By ▼ -0.05 (-0.08%)
UNITY 26.90 Decreased By ▼ -0.09 (-0.33%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
BR100 8,052 Increased By 75.9 (0.95%)
BR30 25,581 Decreased By -21.4 (-0.08%)
KSE100 76,707 Increased By 498.6 (0.65%)
KSE30 24,698 Increased By 260.2 (1.06%)

SSGC's Meter Manufacturing Plant achieved a record production of 750,001 gas meters, two months before the closing of the financial year 2013-14. This remarkable feat of the Meter Plant's management and workers was acknowledged at a ceremony called 'Celebration of Achievement', held at the Plant's premises on Monday in which Zuhair Siddiqui, MD, SSGC was the chief guest.
What was even more outstanding about the achievement was that the rejection rates for both the G-4 and G-1.6 meters were the lowest ever in the meter plant's history. In his address, the MD SSGC reiterated that the Meter Plant has always raised the performance bar through constant business process re-engineering. On the occasion, he announced a 5 percent salary hike of HR and 3rd party workers and Rs 3,000 bonus for the workers of the plant.
Irfan Zafar, Sr General Manager (Operations) applauded the determination and hard work of the facility workers and said that no matter how ambitious the targets are quality of production must never be compromised. Earlier, Saeed Rizvi, GM (Meter Plant) gave a comprehensive overview about the production trend of the Plant for the last 10 years as well as future projections and plans. He said that the total number of components required for assembling G-1.6 and G-4 gas meters are 57 and 49, respectively. Rizvi said that on average 130 seconds are spent on producing a single meter. He further added that the Plant manufactures 2,200 G-4 units and 750 G-1.6 units per day. The GM said that by the end of the current fiscal year, that the target is 880,000 meters while the projection for the FY 2014-15 is 1,000,000 units.
On behalf of the workers, Aslam Rajput, Chairman, PLU (CBA) assured the management of their continued dedication and hard work. Fayyaz Merchant, Sr General Manager (Engineering Services) presented a memento to the MD. Two of the meter plant's personnel presented MD with a chrome model of G-1.6 meter. Earlier, the MD was also briefed on various stages of production, right from the fixing of diaphragm assembly to the underwater leak testing of the unit produced.-PR

Copyright Business Recorder, 2014

Comments

Comments are closed.