BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.18%)
KSE30 Decreased By (-0.19%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.16 Increased By ▲ 0.07 (1.38%)
BML 54.55 Decreased By ▼ -0.43 (-0.78%)
BOP 33.11 Increased By ▲ 0.13 (0.39%)
CNERGY 10.41 Increased By ▲ 0.31 (3.07%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.20 Increased By ▲ 0.95 (1.85%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.20 Increased By ▲ 0.14 (1.98%)
KOSM 5.80 Increased By ▲ 0.26 (4.69%)
LOTCHEM 27.14 Decreased By ▼ -1.98 (-6.8%)
MLCF 90.25 Increased By ▲ 1.43 (1.61%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.78 Increased By ▲ 0.76 (1.38%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.88 Increased By ▲ 1.93 (0.62%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.35 Increased By ▲ 0.36 (0.88%)
PIBTL 16.10 Increased By ▲ 0.14 (0.88%)
PPL 213.99 Increased By ▲ 1.33 (0.63%)
PRL 54.20 Increased By ▲ 1.66 (3.16%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.10 No Change ▼ 0.00 (0%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.19 Increased By ▲ 0.44 (2.48%)
TPLP 13.12 Decreased By ▼ -0.10 (-0.76%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.81 Increased By ▲ 2.92 (5.13%)

ISLAMABAD: The Ministry of Railways has demanded Rs 73 billion for ongoing and new projects in the next Public Sector Development Programme (PSDP) for fiscal year 2018-19.

The ministry has demanded Rs 70.5 billion for ongoing projects while Rs 2.5 billion for new projects, according to a document here on Wednesday.

It said that Rs 5,861 million had been proposed for procurement of 585 Hopper Wagons and 20 bogie brake vans for coal transportation.

The ministry has also demanded Rs 8,863 million for procurement of 780 High Capacity Bogie (Hopper) wagons and 20 bogie brake vans for transportation coal.

Rs 6558.524 million has been proposed for rehabilitation of 27 HGMU-30 class diesel electric locomotives, the document added.

A sum of Rs 7,142.102 million has been demanded for rehabilitation of rolling stock, tack, repairing of 800 coaches, 2,000 wagons and acquisition of land for railway container yard, station and railway line from sea port to coastal highway at Gwadar.

The document said that Rs 1,703.5 million had also been suggested in the PSDP for doubling of existing track from Port Qasim to bin Qasim Station, feasibility study to connect Gwadar with Karachi, and feasibility from Gwadar to Besima and from Besima to Jacobabad via Khuzdar.

Rs 11,022.634 million has been proposed for preliminary design for up-gradation of main line (ML-1), establishment of dry-port near Havelian under the China Pakistan Economic Corridor and hiring of design vetting consultations and reopening of rail car from Kohat to Rawalpindi on experimental basis.

Copyright APP (Associated Press of Pakistan), 2018
 

Comments

Comments are closed for this article.