BR100 Increased By (1.66%)
BR30 Increased By (1.75%)
KSE100 Increased By (1.2%)
KSE30 Increased By (1.4%)
AGHA 7.48 Increased By ▲ 0.04 (0.54%)
BECO 5.30 No Change ▼ 0.00 (0%)
BML 57.22 Increased By ▲ 0.16 (0.28%)
BOP 33.92 Increased By ▲ 0.43 (1.28%)
CNERGY 11.10 Increased By ▲ 0.36 (3.35%)
CSIL 6.06 Increased By ▲ 0.02 (0.33%)
FCCL 55.90 Increased By ▲ 1.72 (3.17%)
FFL 16.08 Increased By ▲ 0.01 (0.06%)
FNEL 1.21 Decreased By ▼ -0.01 (-0.82%)
KEL 7.30 Increased By ▲ 0.12 (1.67%)
KOSM 6.10 Increased By ▲ 0.17 (2.87%)
LOTCHEM 27.29 Increased By ▲ 0.32 (1.19%)
MLCF 97.45 Increased By ▲ 2.58 (2.72%)
NBP 204.44 Increased By ▲ 4.15 (2.07%)
NCPL 56.15 Increased By ▲ 0.68 (1.23%)
NPL 65.98 Increased By ▲ 0.36 (0.55%)
OGDC 319.09 Increased By ▲ 5.05 (1.61%)
PACE 10.66 Increased By ▲ 0.15 (1.43%)
PAEL 42.52 Increased By ▲ 0.25 (0.59%)
PIBTL 17.08 Increased By ▲ 0.04 (0.23%)
PPL 221.32 Increased By ▲ 5.11 (2.36%)
PRL 63.42 Increased By ▲ 3.28 (5.45%)
PTC 72.49 Increased By ▲ 0.48 (0.67%)
SSGC 25.93 Increased By ▲ 0.65 (2.57%)
TBL 9.72 Increased By ▲ 0.05 (0.52%)
TELE 8.46 Increased By ▲ 0.21 (2.55%)
TPL 21.47 Increased By ▲ 1.14 (5.61%)
TPLP 14.71 Increased By ▲ 1.34 (10.02%)
TREET 23.19 Increased By ▲ 0.14 (0.61%)
TRG 60.81 Decreased By ▼ -0.04 (-0.07%)

ISLAMABAD: National Electric Power Regulatory Authority (NEPRA) has altered Prosumer Regulations to further tighten the process of net metering.

According to sources under the new regulations a new consumer/prosumer is required to have concurrence from the Authority irrespective the size of the facility. Further for submitting the application it is required to deposit a fee calculated at Rs 1000/kw.

The sources further stated that in the previous regulations, consumers installing distributed generation (DG) of above 25kw were required to obtain licence/concurrence from the Authority with the same processing fee as mentioned above however, for consumers with DG facility up to the size of 25kw or below were required to obtain the permission from Disco however the same has been changed due to the provisions of the NEPRA Act.

Copyright Business Recorder, 2026

Comments

200 characters remaining