BR100 Increased By (0.24%)
BR30 Decreased By (-0.18%)
KSE100 Increased By (0.16%)
KSE30 Increased By (0.11%)
AGHA 7.83 Increased By ▲ 0.08 (1.03%)
BECO 5.19 No Change ▼ 0.00 (0%)
BML 57.72 Decreased By ▼ -0.94 (-1.6%)
BOP 34.05 Increased By ▲ 0.36 (1.07%)
CNERGY 10.02 Decreased By ▼ -0.59 (-5.56%)
CSIL 5.32 Increased By ▲ 0.02 (0.38%)
FCCL 54.75 Increased By ▲ 1.01 (1.88%)
FFL 16.68 Increased By ▲ 0.22 (1.34%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.77 Increased By ▲ 0.13 (2.3%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.57 Decreased By ▼ -1.79 (-1.86%)
NBP 202.50 Decreased By ▼ -1.03 (-0.51%)
NCPL 57.05 Increased By ▲ 0.20 (0.35%)
NPL 67.92 Increased By ▲ 0.61 (0.91%)
OGDC 316.99 Decreased By ▼ -1.23 (-0.39%)
PACE 10.73 Increased By ▲ 0.10 (0.94%)
PAEL 43.32 Increased By ▲ 1.55 (3.71%)
PIBTL 16.71 Decreased By ▼ -0.10 (-0.59%)
PPL 220.25 Increased By ▲ 0.08 (0.04%)
PRL 50.00 Increased By ▲ 0.95 (1.94%)
PTC 70.60 Increased By ▲ 0.59 (0.84%)
SSGC 28.37 Decreased By ▼ -0.77 (-2.64%)
TBL 9.82 Increased By ▲ 0.05 (0.51%)
TELE 8.81 Decreased By ▼ -0.01 (-0.11%)
TPL 18.30 Increased By ▲ 1.13 (6.58%)
TPLP 13.30 Increased By ▲ 0.79 (6.31%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 59.95 Decreased By ▼ -0.27 (-0.45%)

KARACHI: The Lyari Transformation Project has been formally inaugurated, with Sindh Minister for Local Government, Syed Nasir Hussain Shah, attending the ceremony as chief guest.

The project, estimated at a cost of Rs25.28 billion, includes development of roads, sewerage, water supply, and beautification. According to officials, the project will be completed within four years, while work on the first phase has already begun.

The inauguration ceremony of the Lyari Transformation Project was held today in Lyari, where Sindh Minister for Local Government Syed Nasir Hussain Shah formally inaugurated the project. Members of the Provincial Assembly of Pakistan Peoples Party, party leaders, local government representatives, and a large number of residents were also present on the occasion.

Addressing the ceremony, Minister for Local Government Syed Nasir Hussain Shah said that Lyari is an important and historic area of Karachi which was neglected in the past; however, the present government is taking serious steps for its complete rehabilitation and development. He said that the Lyari Transformation Project is a major step towards resolving long-standing issues of the area and will significantly improve the quality of life of its residents.

According to officials, the total cost of the mega project has been estimated at Rs25.28 billion, and it will be completed within four years, with completion expected by 2029. The first phase of the project has already commenced, focusing primarily on restoration of basic infrastructure.

Under the project, modern roads will be constructed in Lyari, and a network of roads will be developed across the area to ease traffic flow. In addition, new water supply lines will be laid and existing ones will be repaired to ensure provision of clean drinking water and address water shortages on a permanent basis.

Improvement of the drainage system is also a key component of the project, under which new sewerage lines will be installed and the existing system will be upgraded to prevent accumulation of rainwater during monsoon seasons. Comprehensive measures will also be taken for cleaning and improvement of storm-water drains.

The project also includes better management of underground cabling, which will not only improve the electricity system but also enhance the overall aesthetics of the area. Alongside this, a comprehensive beautification plan has been devised for Lyari, under which parks, green belts, and other public spaces will be upgraded.

At the conclusion of the ceremony, the Minister directed the concerned authorities to maintain the pace of work and ensure quality, so that the project is completed within the stipulated time and its benefits reach the people of Lyari at the earliest.

Copyright Business Recorder, 2026

Comments

200 characters remaining