BR100 Increased By (0.84%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.59%)
BECO 5.96 Increased By ▲ 0.19 (3.29%)
BML 53.30 Increased By ▲ 0.30 (0.57%)
BOP 34.37 Increased By ▲ 0.38 (1.12%)
CNERGY 8.10 Decreased By ▼ -0.01 (-0.12%)
DCL 12.32 Increased By ▲ 0.12 (0.98%)
FCCL 53.60 Increased By ▲ 0.77 (1.46%)
FCSC 5.18 Increased By ▲ 0.11 (2.17%)
FFL 18.08 Increased By ▲ 0.13 (0.72%)
FNEL 1.33 Increased By ▲ 0.04 (3.1%)
HUMNL 10.84 Decreased By ▼ -0.04 (-0.37%)
KEL 8.13 Increased By ▲ 0.11 (1.37%)
KOSM 5.50 Decreased By ▼ -0.02 (-0.36%)
MLCF 87.68 Increased By ▲ 1.17 (1.35%)
NBP 187.00 Increased By ▲ 1.84 (0.99%)
PACE 10.70 Increased By ▲ 0.12 (1.13%)
PAEL 40.13 Increased By ▲ 0.71 (1.8%)
PIAHCLA 26.17 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.10 Increased By ▲ 0.43 (2.58%)
PPL 229.70 Increased By ▲ 1.52 (0.67%)
PRL 34.95 Increased By ▲ 0.27 (0.78%)
PTC 67.75 Increased By ▲ 2.42 (3.7%)
SEARL 91.30 Increased By ▲ 1.17 (1.3%)
SSGC 26.88 Increased By ▲ 0.28 (1.05%)
TELE 8.68 Increased By ▲ 0.40 (4.83%)
THCCL 59.14 Increased By ▲ 0.64 (1.09%)
TPLP 8.64 Increased By ▲ 0.42 (5.11%)
TREET 24.67 Increased By ▲ 0.14 (0.57%)
TRG 69.93 Increased By ▲ 0.22 (0.32%)
WAVES 10.09 Increased By ▲ 0.15 (1.51%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)
By

ISLAMABAD: Prime Minister Shehbaz Sharif on Tuesday directed the relevant authorities to ensure world-class standards, transparency, and complete digitisation in the execution of the Jinnah Medical Complex and Daanish University projects.

During his visit to the sites, the prime minister was given a detailed briefing on the projects being constructed in the institutional sector along Srinagar Highway.

It was informed that 600 kanals of land had been allocated for Jinnah Medical Complex and 800 kanals for Daanish University developments.

JMC construction: PM calls for acceleration of work to meet project’s deadlines

Officials informed the prime minister that water-supply works will be completed within two months, while the PC-1 had been prepared in consultation with experts.

On the occasion, the prime minister stressed that only the most credible and well-reputed companies must be pre-qualified and awarded the contracts to ensure the highest construction and operational quality. He ordered that all payments be processed through a third party to maintain transparency.

Comments

Comments are closed for this article.