BR100 Increased By (0.73%)
BR30 Increased By (0.59%)
KSE100 Increased By (0.71%)
KSE30 Increased By (0.75%)
AGHA 7.76 Increased By ▲ 0.01 (0.13%)
BECO 5.20 Increased By ▲ 0.01 (0.19%)
BML 57.01 Decreased By ▼ -1.65 (-2.81%)
BOP 34.23 Increased By ▲ 0.54 (1.6%)
CNERGY 10.83 Increased By ▲ 0.22 (2.07%)
CSIL 5.43 Increased By ▲ 0.13 (2.45%)
FCCL 54.90 Increased By ▲ 1.16 (2.16%)
FFL 16.72 Increased By ▲ 0.26 (1.58%)
FNEL 1.25 Increased By ▲ 0.03 (2.46%)
KEL 7.44 Increased By ▲ 0.16 (2.2%)
KOSM 5.76 Increased By ▲ 0.12 (2.13%)
LOTCHEM 29.78 Increased By ▲ 0.13 (0.44%)
MLCF 95.80 Decreased By ▼ -0.56 (-0.58%)
NBP 204.00 Increased By ▲ 0.47 (0.23%)
NCPL 57.80 Increased By ▲ 0.95 (1.67%)
NPL 69.12 Increased By ▲ 1.81 (2.69%)
OGDC 318.40 Increased By ▲ 0.18 (0.06%)
PACE 10.82 Increased By ▲ 0.19 (1.79%)
PAEL 42.90 Increased By ▲ 1.13 (2.71%)
PIBTL 16.88 Increased By ▲ 0.07 (0.42%)
PPL 221.00 Increased By ▲ 0.83 (0.38%)
PRL 51.60 Increased By ▲ 2.55 (5.2%)
PTC 70.90 Increased By ▲ 0.89 (1.27%)
SSGC 28.45 Decreased By ▼ -0.69 (-2.37%)
TBL 9.95 Increased By ▲ 0.18 (1.84%)
TELE 8.94 Increased By ▲ 0.12 (1.36%)
TPL 18.24 Increased By ▲ 1.07 (6.23%)
TPLP 13.04 Increased By ▲ 0.53 (4.24%)
TREET 22.80 Increased By ▲ 0.21 (0.93%)
TRG 59.85 Decreased By ▼ -0.37 (-0.61%)
By

ISLAMABAD: Prime Minister Shehbaz Sharif on Tuesday directed the relevant authorities to ensure world-class standards, transparency, and complete digitisation in the execution of the Jinnah Medical Complex and Daanish University projects.

During his visit to the sites, the prime minister was given a detailed briefing on the projects being constructed in the institutional sector along Srinagar Highway.

It was informed that 600 kanals of land had been allocated for Jinnah Medical Complex and 800 kanals for Daanish University developments.

JMC construction: PM calls for acceleration of work to meet project’s deadlines

Officials informed the prime minister that water-supply works will be completed within two months, while the PC-1 had been prepared in consultation with experts.

On the occasion, the prime minister stressed that only the most credible and well-reputed companies must be pre-qualified and awarded the contracts to ensure the highest construction and operational quality. He ordered that all payments be processed through a third party to maintain transparency.

Comments

Comments are closed for this article.