BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

KARACHI: The Acting Director General of the Pakistan Airports Authority (PAA), Air Vice Marshal (AVM) Zeeshan Saeed, who also serves as the Additional Director General, visited the New Gwadar International Airport (NGIAP) today. He was accompanied by Deputy DG Airports Engr Sadiq Ur Rehman and Project Director Engr Faiz Ullah Khattak.

The visit was conducted to review the operational readiness of the airport and to engage with representatives from key stakeholders, including the Gwadar Development Authority (GDA), Gwadar Port Authority (GPA), Gwadar Chamber of Commerce, Pakistan Navy, Pakistan Army, and others.

Project Director Engr Faiz Ullah Khattak briefed the delegation and representatives of airport stakeholders on NGIAP's state-of-the-art features and its vast potential for fostering business and investment opportunities. Expressing satisfaction over the airport’s readiness, (AVM) Zeeshan Saeed commended the project team for their efforts. He reaffirmed PAA's commitment to operationalising the airport by the end of this month.

The New Gwadar International Airport, a flagship project under the China-Pakistan Economic Corridor (CPEC), is poised to become a major driver of economic growth and regional connectivity. Built with Chinese assistance at an estimated cost of USD 246 million, the airport is equipped with modern facilities, including a world-class terminal building and a runway capable of accommodating large aircraft.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.