BML 4.83 Decreased By ▼ -0.08 (-1.63%)
BOP 13.04 Decreased By ▼ -0.09 (-0.69%)
CNERGY 7.00 Decreased By ▼ -0.04 (-0.57%)
CPHL 83.90 Decreased By ▼ -0.47 (-0.56%)
DCL 13.54 Decreased By ▼ -0.26 (-1.88%)
DGKC 171.70 Increased By ▲ 0.96 (0.56%)
FCCL 45.81 Decreased By ▼ -0.21 (-0.46%)
FFL 15.75 Increased By ▲ 0.11 (0.7%)
GCIL 26.20 Increased By ▲ 0.11 (0.42%)
HUBC 144.21 Decreased By ▼ -1.46 (-1%)
KEL 5.27 No Change ▼ 0.00 (0%)
KOSM 6.36 No Change ▼ 0.00 (0%)
LOTCHEM 20.65 No Change ▼ 0.00 (0%)
MLCF 84.59 Increased By ▲ 0.11 (0.13%)
NBP 124.05 Decreased By ▼ -2.17 (-1.72%)
PAEL 41.40 Decreased By ▼ -0.39 (-0.93%)
PIAHCLA 22.36 Increased By ▲ 0.33 (1.5%)
PIBTL 8.83 Increased By ▲ 0.10 (1.15%)
POWER 13.85 Decreased By ▼ -0.04 (-0.29%)
PPL 163.50 Decreased By ▼ -1.97 (-1.19%)
PREMA 43.10 Increased By ▲ 0.99 (2.35%)
PRL 32.37 Decreased By ▼ -0.15 (-0.46%)
PTC 21.98 Decreased By ▼ -1.71 (-7.22%)
SNGP 116.30 Decreased By ▼ -0.25 (-0.21%)
SSGC 43.45 Decreased By ▼ -1.12 (-2.51%)
TELE 7.86 Decreased By ▼ -0.18 (-2.24%)
TPLP 10.05 Increased By ▲ 0.05 (0.5%)
TREET 23.00 Decreased By ▼ -0.08 (-0.35%)
TRG 56.66 Decreased By ▼ -0.13 (-0.23%)
WTL 1.53 Increased By ▲ 0.01 (0.66%)
BR100 13,864 Increased By 84.7 (0.61%)
BR30 39,499 Decreased By -119.7 (-0.3%)
KSE100 136,380 Increased By 440.1 (0.32%)
KSE30 41,546 Increased By 172.6 (0.42%)

KARACHI: Sindh Energy Minister Syed Nasir Hussain Shah has said that 172 public sector buildings will initially be provided with 47 MW of electricity through solarization in three different phases.

He expressed these views at the Energy Department during a meeting with a delegation of the World Bank's technical mission. The World Bank mission was led by Senior Energy Specialist/Task Team Leader Dmytro Glazkov while Project Director Sindh Solar Energy Mahfooz Qazi and others were also present on the occasion.

Minister Energy gave more details and said that in the first phase of solarization, 21.7MW of electricity is being provided through the solar panels of 34 public sector buildings, while in the second phase, 3.30 MW will be completed by 2024 and 23 government buildings will be provided with 10 MW of electricity through solar panels. Similarly, in the third phase, there is a plan to provide 15 MW electricity to 100 government buildings through solarization from July 2024.

Minister added that 4MW floating solar will be installed at Hyderabad Qasimabad treatment plant. Nasir Shah told the delegation that according to the party manifesto and direct chairman PPP Bilawal Bhutto Zardari, free electricity should be provided to the people as soon as possible through solarization. The Sindh government is focusing on speeding up the solarization process as much as possible.

He said that the Energy Department is trying to provide free electricity to poor consumers using 100 to 300 units through phased solarization, while work on various projects is going on.

The delegation of the World Bank Technical Mission expressed satisfaction over the pace of the solar energy project and assured its full cooperation.

Nasir Shah told the delegation that the pace of the solar project is being monitored on a daily basis and directed to accelerate it further.

Copyright Business Recorder, 2024

Comments

Comments are closed.