AVN 64.71 Decreased By ▼ -0.25 (-0.38%)
BAFL 30.80 Increased By ▲ 0.55 (1.82%)
BOP 4.70 Increased By ▲ 0.06 (1.29%)
CNERGY 3.81 Decreased By ▼ -0.07 (-1.8%)
DFML 13.36 Decreased By ▼ -0.19 (-1.4%)
DGKC 42.00 Decreased By ▼ -0.20 (-0.47%)
EPCL 46.75 Increased By ▲ 0.94 (2.05%)
FCCL 11.29 Decreased By ▼ -0.12 (-1.05%)
FFL 5.08 Decreased By ▼ -0.09 (-1.74%)
FLYNG 5.82 Decreased By ▼ -0.28 (-4.59%)
GGL 9.81 Decreased By ▼ -0.23 (-2.29%)
HUBC 63.88 Increased By ▲ 0.58 (0.92%)
HUMNL 5.80 Increased By ▲ 0.05 (0.87%)
KAPCO 27.75 Decreased By ▼ -0.08 (-0.29%)
KEL 2.16 Increased By ▲ 0.03 (1.41%)
LOTCHEM 24.86 Decreased By ▼ -0.47 (-1.86%)
MLCF 21.39 Decreased By ▼ -0.18 (-0.83%)
NETSOL 83.40 Decreased By ▼ -1.59 (-1.87%)
OGDC 87.80 Increased By ▲ 1.57 (1.82%)
PAEL 10.77 Decreased By ▼ -0.15 (-1.37%)
PIBTL 4.20 Decreased By ▼ -0.03 (-0.71%)
PPL 79.06 Increased By ▲ 0.54 (0.69%)
PRL 13.59 Decreased By ▼ -0.03 (-0.22%)
SILK 0.90 Increased By ▲ 0.01 (1.12%)
SNGP 41.23 Increased By ▲ 0.37 (0.91%)
TELE 6.01 Increased By ▲ 0.01 (0.17%)
TPLP 15.71 Decreased By ▼ -0.29 (-1.81%)
TRG 110.80 Decreased By ▼ -0.90 (-0.81%)
UNITY 13.84 Decreased By ▼ -0.15 (-1.07%)
WTL 1.16 Increased By ▲ 0.03 (2.65%)
BR100 4,034 Increased By 7.5 (0.19%)
BR30 14,472 Increased By 69.9 (0.49%)
KSE100 40,490 Increased By 39.9 (0.1%)
KSE30 15,128 Increased By 17.8 (0.12%)
Follow us

KARACHI: Mari Petroleum Company Limited (MPCL) has successfully completed the construction of SGPC Phase-II facilities to process low Btu gas from Goru-B reservoir of Mari Gas Field, Daharki, Sindh.

According to material information sent to Pakistan Stock Exchange on Friday, the phased commissioning and performance testing of the processing facilities is ongoing. After processing, 50 Million Standard Cubic Feet per Day (MMSCFD) of pipeline specification gas is being achieved and the Company is supplying around 47.5 MMSCFD of processed gas to SNGPL, while the remaining 2.5 MMSCFD is consumed as fuel gas to operate the plant.

The gas is being supplied via MPCL’s own 20 inch, 25 km long, cross country gas transmission pipeline connecting SGPC to SNGPL valve assembly (QV -2) at Muhammadpur.

Copyright Business Recorder, 2023

Comments

Comments are closed.

MPCL completes SGPC phase-II facilities

SBP denies USD rate capping caused loss

Import of used tractors: ECC asks MoC, SBP to rethink

IMF conditionalities: Govt raises fuel prices in a gesture of compliance

Imran Khan censures govt for ‘massive’ fuel hike

Dar says fiscal discipline has to be imposed

Hike to fuel inflation: Tarin

Decline in cess collection lands body in trouble: Food ministry seeks Rs666.64m grant for cotton committee

PKR slide likely to fuel inflation in a big way

Israel appears to have been behind drone strike on Iran: US official

Termination of SEL’s LoS: PPIB seeks comments from CPPA-G, NTDC