BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)
Pakistan

Sukkur-Hyderabad Motorway: PM wants more projects on public-private partnership model

  • Performs ground-breaking of 306-km-long Hyderabad-Sukkur Motorway (M-6)
Published Updated

Prime Minister Shehbaz Sharif on Tuesday directed authorities to pursue more projects on a Public-Private Partnership (PPP) model across Pakistan. The remarks were made while he was addressing the foundation-stone laying ceremony of the 306-km-long Hyderabad-Sukkur Motorway (M-6) in Sukkur, which will be built at a cost of Rs307 billion.

“This project was delayed for a long period … however, it will now be completed in a period of 30 months, and will start benefitting the citizens of Sindh and Pakistan,” said PM Shehbaz.

M-6 is the last part of the Peshawar-Karachi route after which all major cities will be connected by the motorway.

The prime minister said the material used in the construction of the said project would be similar to that utilised in the construction of motorways across Pakistan. “Through our joint efforts we will achieve this quality and completion period,” he said.

The 306km project is based on a PPP mode of construction.

“I urge the Ministry of Planning to come forward and plan key projects on the basis of PPP, in order to encourage this model of investment in Pakistan,” he said.

PM rejects default speculations with much vehemence

The prime minister lauded the role of Sindh Chief Minister Murad Ali Shah in the promotion of PPP model in the province, urging authorities to promote it in other provinces as well.

He stressed on the importance of better road connections to Balochistan: “Without the development of Balochistan, Pakistan's development is incomplete,” he said.

PM for united efforts to steer country out of all challenges

As per the National Highway Authority (NHA), the construction of the M-6 will create over 6,500 (direct) and 25,000 (indirect) jobs. The project will complete the North-South Motorway Corridor and reduce travel time between Hyderabad and Sukkur by 50%. It will also help in the economic growth of Sindh and uplift adjoining districts.

Comments

Comments are closed for this article.

Shan Ali Dec 13, 2022 11:23pm
All the IMF shareholders must be knowing how much loan Pakistan has received since 1947. IMF also knows the exact breakup of funds received by each political party during their tenure. IMF should also know the numbers and cost of each project within the tenure of either party's government. IMF also knows which opposition party had disturbed more to the ruling party through protests, agitation and defamation resulted instability and insecurity within the country.
0