BR100 Increased By (0.81%)
BR30 Increased By (1.03%)
KSE100 Increased By (0.52%)
KSE30 Increased By (0.52%)
BECO 6.20 Increased By ▲ 0.43 (7.45%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.40 Increased By ▲ 0.41 (1.21%)
CNERGY 8.15 Increased By ▲ 0.04 (0.49%)
DCL 12.16 Decreased By ▼ -0.04 (-0.33%)
FCCL 53.40 Increased By ▲ 0.57 (1.08%)
FCSC 5.18 Increased By ▲ 0.11 (2.17%)
FFL 18.07 Increased By ▲ 0.12 (0.67%)
FNEL 1.32 Increased By ▲ 0.03 (2.33%)
HUMNL 10.86 Decreased By ▼ -0.02 (-0.18%)
KEL 8.09 Increased By ▲ 0.07 (0.87%)
KOSM 5.40 Decreased By ▼ -0.12 (-2.17%)
MLCF 87.36 Increased By ▲ 0.85 (0.98%)
NBP 187.03 Increased By ▲ 1.87 (1.01%)
PACE 10.70 Increased By ▲ 0.12 (1.13%)
PAEL 40.00 Increased By ▲ 0.58 (1.47%)
PIAHCLA 26.15 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.02 Increased By ▲ 0.35 (2.1%)
PPL 230.00 Increased By ▲ 1.82 (0.8%)
PRL 34.90 Increased By ▲ 0.22 (0.63%)
PTC 67.15 Increased By ▲ 1.82 (2.79%)
SEARL 90.98 Increased By ▲ 0.85 (0.94%)
SSGC 26.82 Increased By ▲ 0.22 (0.83%)
TELE 8.64 Increased By ▲ 0.36 (4.35%)
THCCL 58.69 Increased By ▲ 0.19 (0.32%)
TPLP 8.65 Increased By ▲ 0.43 (5.23%)
TREET 24.78 Increased By ▲ 0.25 (1.02%)
TRG 69.85 Increased By ▲ 0.14 (0.2%)
WAVES 10.09 Increased By ▲ 0.15 (1.51%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

PESHAWAR: Land acquisition for the construction of the 30-KM Dir Motorway has been initiated and a committee is constituted to overcome any impediments and ensure timely completion of the acquisition process. Additionally, the initial survey for the entire length of the proposed motorway has also been completed.

This was revealed in a meeting held here, with Chief Minister Khyber Pakhtunkhwa Mahmood Khan in the chair, to review progress on mega projects of the roads sector in the province, said a handout issued here on Sunday.

Principal Secretary to CM Amjad Ali Khan, Secretary Planning and Development Shah Mehmood, Secretary Communications & works and senior officers of Pakhtunkhwa Highways Authority attended the meeting.

The meeting was briefed in detail about progress made so far on Dir Motorway, Peshawar-DI Khan Motorway, Swat Motorway Phase 2, Madyan Bypass, Bahrain Bypass and other mega projects in the roads network sector.

The participants were informed that as per the initial tentative allotment, the overall length of Dir Motorway is 30 kilometers, having four lanes and it also includes the construction of two tunnels.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.