BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

ISLAMABAD: Sindh Chief Minister Syed Murad Ali Shah has sought prime minister’s help for resumption of gas supply to Jamshoro Joint Venture Limited (JJVL) as the flood affected people of Sindh direly need LPG.

In a letter to Prime Minister Shehbaz Sharif, the chief minister Sindh has annexed a letter he received from JJVL wherein the company has stated that its LPG production plant located in Hyderabad, Sindh is shut since June 2020 due to non-supply of gas by SSGCL.

In this connection, the chief minister has submitted that in the aftermath of devastating floods that have wreaked havoc in most parts of Sindh, one of the urgent requirements for the people is availability of fuel for cooking.

According to the chief minister, dry wood, which is commonly used, may no longer be easily available to them, adding that M/s JJVL plant is capable of serving 25,000 homeless people per day, who have no fuel for cooking.

The company has requested to restart the JJVL LPG plant for the benefit of people of Sindh.

The Sindh CM has requested the prime minister to pass instructions to the Ministry of Energy / SSGCL immediately for resumption of gas supply to JJVL for production of LPG and NGL which can be supplied to the flood affected people in their area of operation.

LPG production plant in Sindh, which is capable of meeting the energy requirements of 500,000 homes and effect the local prices of LPG very favourably, is shut since June 2020.

The LGP company, in its letter to Chief Minister , Sindh argued that at this time when every unit of energy is needed in the country, especially Sindh, he should forcefully take-up the matter with the Prime Minister as the restart of the JJVL LPG plant is essential for the benefit of people of Sindh and the country.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.