AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,943 Increased By 105.5 (1.35%)
BR30 25,639 Increased By 187.1 (0.73%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

Hub Power Company Ltd (HUBCO) in its notice to the Pakistan Stock Exchange (PSX) on Friday informed that its two engines at Narowal Energy Plant developed fault and are unavailable for electricity generation.

“The alternators of two engines at Narowal Plant have developed a fault due to which these engines having 38 MW capacity will not be available for electricity generation and have been placed under forced outages to investigate and fix the fault,” read the statement.

Narowal Plant is owned and operated by Narowal Energy Limited, a wholly owned subsidiary of the Hub Power Company Limited, and has a gross capacity of 225 MW comprising of eleven reciprocating engines and one steam turbine.

The Hub Power Company Limited (HUBCO) has a combined installed power generation capacity of 2,921MW.

HUBCO has four projects listed in the China-Pakistan Economic Corridor (CPEC), including imported coal-based China Power Hub Generation Company (Private) Limited (CPHGC) at Hub, Thar Energy Limited (TEL), ThalNova Power Thar (Pvt.) Ltd. and Sindh Engro Coal Mining Company (SECMC) at Thar Coal Block II.

As per HUBCO annual report for 2021, the consolidated net profit during the year under review is Rs33,688 million, resulting in earnings per share of Rs25.97 compared to net profit of Rs25,044 million and earnings per share of Rs19.31 last year.

The increase in profits is mainly due to higher share of profit from an associate (China Power Hub Power Generation Company Limited, which started Commercial Operations on August 17, 2019), depreciation of Rupee against USD and lower financing cost partly offset by higher taxes on income from management services.

Comments

Comments are closed.