AIRLINK 73.18 Increased By ▲ 0.38 (0.52%)
BOP 5.00 Decreased By ▼ -0.06 (-1.19%)
CNERGY 4.37 Increased By ▲ 0.04 (0.92%)
DFML 29.95 Decreased By ▼ -0.57 (-1.87%)
DGKC 91.39 Increased By ▲ 5.44 (6.33%)
FCCL 23.15 Increased By ▲ 0.80 (3.58%)
FFBL 33.50 Increased By ▲ 0.28 (0.84%)
FFL 9.92 Increased By ▲ 0.14 (1.43%)
GGL 10.35 Decreased By ▼ -0.05 (-0.48%)
HBL 113.01 Decreased By ▼ -0.61 (-0.54%)
HUBC 136.28 Increased By ▲ 0.08 (0.06%)
HUMNL 9.60 Decreased By ▼ -0.43 (-4.29%)
KEL 4.78 Increased By ▲ 0.12 (2.58%)
KOSM 4.72 Increased By ▲ 0.32 (7.27%)
MLCF 39.89 Increased By ▲ 1.54 (4.02%)
OGDC 133.90 Increased By ▲ 0.50 (0.37%)
PAEL 28.85 Increased By ▲ 1.45 (5.29%)
PIAA 25.00 Increased By ▲ 0.24 (0.97%)
PIBTL 6.94 Increased By ▲ 0.39 (5.95%)
PPL 122.40 Increased By ▲ 1.19 (0.98%)
PRL 27.40 Increased By ▲ 0.25 (0.92%)
PTC 14.80 Increased By ▲ 0.91 (6.55%)
SEARL 60.40 No Change ▼ 0.00 (0%)
SNGP 70.29 Increased By ▲ 1.76 (2.57%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 8.85 Decreased By ▼ -0.20 (-2.21%)
TPLP 11.32 Increased By ▲ 0.06 (0.53%)
TRG 66.57 Increased By ▲ 0.87 (1.32%)
UNITY 25.20 Decreased By ▼ -0.05 (-0.2%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,674 Increased By 40.1 (0.53%)
BR30 25,457 Increased By 285.1 (1.13%)
KSE100 73,086 Increased By 427.5 (0.59%)
KSE30 23,427 Increased By 44.5 (0.19%)

KARACHI: Avanceon Saudi for Energy Co WLL, a subsidiary of Avanceon FZE, has been selected to execute an innovative and state of the art SCADA solution for the Masjid Al-Haram Expansion Project in Makkah.

According to material information sent to Pakistan Stock Exchange on Monday, the Haram Expansion Project aims to restore Masjid Al-Haram’s central position in the city and give the mosque an architectural and engineering aspect to welcome growing number of pilgrims.

Avanceon will be responsible for the PLC based SCADA systems, Instrumentation, Real Time Data Acquisition, Performance Monitoring Systems and Turnkey Automation to ensure new praying areas and essential services to millions of pilgrims who visit Makkah for Hajj and Umrah.

This contract execution gives a pathway for positive impact on group’s business and value for its shareholders, it added.

With the Al-Ka’bah as its focal point, the Haram Expansion Project will extend radially outwards across a 684 m distance. It will include the construction of a new Haram building, courtyards around the mosque, a new services building, a Central Utility Complex (CUC), a hospital, civil defence, and security facilities, as well as bridges and pedestrian walkways. A utility tunnel serves as the main artery, harbouring utilities from the CUC to the Haram, including chilled water, water supply, fire fighting, waste water, refuse collection, and electric cables. With water as the lifeblood of a pilgrims’ journey, water proofing and other measures will be employed to ensure that the spring water, Zamzam, remains contaminant-free.

Avanceon will provide all services in accordance with the local regulatory and QHSE authorities’ requirements. For the execution of this project, Avanceon will be partnering with World Class OEMs. All necessary studies will be carried out before the start of the project with fail-safe plans to address any safety, quality, and environmental issues.

Avanceon’s long term service history, strong project references and a world class solution played a major role in acquiring this project, the company said.

Copyright Business Recorder, 2022

Comments

Comments are closed.