AIRLINK 73.06 Decreased By ▼ -6.94 (-8.68%)
BOP 5.09 Decreased By ▼ -0.09 (-1.74%)
CNERGY 4.37 Decreased By ▼ -0.09 (-2.02%)
DFML 32.45 Decreased By ▼ -2.71 (-7.71%)
DGKC 75.49 Decreased By ▼ -1.39 (-1.81%)
FCCL 19.52 Decreased By ▼ -0.46 (-2.3%)
FFBL 36.15 Increased By ▲ 0.55 (1.54%)
FFL 9.22 Decreased By ▼ -0.31 (-3.25%)
GGL 9.85 Decreased By ▼ -0.31 (-3.05%)
HBL 116.70 Decreased By ▼ -0.30 (-0.26%)
HUBC 132.69 Increased By ▲ 0.19 (0.14%)
HUMNL 7.10 Increased By ▲ 0.04 (0.57%)
KEL 4.41 Decreased By ▼ -0.24 (-5.16%)
KOSM 4.40 Decreased By ▼ -0.25 (-5.38%)
MLCF 36.20 Decreased By ▼ -1.30 (-3.47%)
OGDC 133.50 Decreased By ▼ -0.97 (-0.72%)
PAEL 22.60 Decreased By ▼ -0.30 (-1.31%)
PIAA 26.01 Decreased By ▼ -0.62 (-2.33%)
PIBTL 6.55 Decreased By ▼ -0.26 (-3.82%)
PPL 115.31 Increased By ▲ 3.21 (2.86%)
PRL 26.63 Decreased By ▼ -0.57 (-2.1%)
PTC 14.10 Decreased By ▼ -0.28 (-1.95%)
SEARL 53.45 Decreased By ▼ -2.94 (-5.21%)
SNGP 67.25 Increased By ▲ 0.25 (0.37%)
SSGC 10.70 Decreased By ▼ -0.13 (-1.2%)
TELE 8.42 Decreased By ▼ -0.87 (-9.36%)
TPLP 10.75 Decreased By ▼ -0.43 (-3.85%)
TRG 63.87 Decreased By ▼ -5.13 (-7.43%)
UNITY 25.12 Decreased By ▼ -0.37 (-1.45%)
WTL 1.27 Decreased By ▼ -0.05 (-3.79%)
BR100 7,465 Decreased By -57.3 (-0.76%)
BR30 24,199 Decreased By -203.3 (-0.83%)
KSE100 71,103 Decreased By -592.5 (-0.83%)
KSE30 23,395 Decreased By -147.4 (-0.63%)

LAHORE: In order to meet the growing demand of electricity across the country, the National Transmission and Despatch Company Limited (NTDC) has decided to expand its infrastructure by constructing transmission lines and new grid stations.

In this regard, to check the progress of under-construction 500 KV substations Faisalabad West and 220 KV Lalian grid station, the Managing Director NTDC Engr. Manzoor Ahmad visited both sites of grid stations on Sunday.

During the visit MD NTDC was apprised that overall 80 percent construction work of the 500 KV Faisalabad West Grid Station and around 60 percent work on 220 KV Lalian Grid Station near Chiniot has been completed so far. MD NTDC inspected and had detailed coordination meeting with NTDC team and contractors of both the projects and directed them to speed up the pace of work through close collaboration to meet the stringent timelines.

Engr. Manzoor Ahmad said that 500 kV grid stations Faisalabad West is being constructed with the cost of Rs 9379 million spread over 90 acres of land. Two transformers of 750 MVA and 3 transformers of 250 MVA will be installed at the grid station. Construction work on 220kV transmission line is also underway. It is pertinent to note that two 500kV transmission lines for said grid station have already been completed and energized. However, 220kV grid station Lalian is being constructed with a cost of Rs 360.77 million. MD NTDC directed to complete 220kV Lalian Grid Station before coming summer.

The projects will strengthen transmission network of both NTDC and FESCO and will help to address the issues of overloading, low voltage and forced load shedding in FESCO region. The completion of the project will facilitate and help to tackle the increasing demand of electricity of domestic, industrial, commercial and agriculture sector related consumers of Faisalabad Electric Supply Company (FESCO).

Later, MD NTDC Engineer Manzoor Ahmad planted trees at both sites. Senior officers’ along with NTDC, NESPAK and contractors were also present during the visit of grid stations.

Copyright Business Recorder, 2021

Comments

Comments are closed.