AIRLINK 73.42 Increased By ▲ 0.62 (0.85%)
BOP 4.99 Decreased By ▼ -0.07 (-1.38%)
CNERGY 4.36 Increased By ▲ 0.03 (0.69%)
DFML 29.79 Decreased By ▼ -0.73 (-2.39%)
DGKC 90.25 Increased By ▲ 4.30 (5%)
FCCL 22.90 Increased By ▲ 0.55 (2.46%)
FFBL 33.70 Increased By ▲ 0.48 (1.44%)
FFL 9.86 Increased By ▲ 0.08 (0.82%)
GGL 10.44 Increased By ▲ 0.04 (0.38%)
HBL 113.49 Decreased By ▼ -0.13 (-0.11%)
HUBC 137.30 Increased By ▲ 1.10 (0.81%)
HUMNL 9.64 Decreased By ▼ -0.39 (-3.89%)
KEL 4.72 Increased By ▲ 0.06 (1.29%)
KOSM 4.81 Increased By ▲ 0.41 (9.32%)
MLCF 39.62 Increased By ▲ 1.27 (3.31%)
OGDC 135.25 Increased By ▲ 1.85 (1.39%)
PAEL 28.57 Increased By ▲ 1.17 (4.27%)
PIAA 24.80 Increased By ▲ 0.04 (0.16%)
PIBTL 6.97 Increased By ▲ 0.42 (6.41%)
PPL 123.20 Increased By ▲ 1.99 (1.64%)
PRL 27.17 Increased By ▲ 0.02 (0.07%)
PTC 14.60 Increased By ▲ 0.71 (5.11%)
SEARL 59.57 Decreased By ▼ -0.83 (-1.37%)
SNGP 69.24 Increased By ▲ 0.71 (1.04%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 9.00 Decreased By ▼ -0.05 (-0.55%)
TPLP 11.59 Increased By ▲ 0.33 (2.93%)
TRG 67.16 Increased By ▲ 1.46 (2.22%)
UNITY 25.25 No Change ▼ 0.00 (0%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,708 Increased By 74.3 (0.97%)
BR30 25,555 Increased By 383.1 (1.52%)
KSE100 73,266 Increased By 608 (0.84%)
KSE30 23,546 Increased By 163.2 (0.7%)

imamnmnm_copy_copy_copy_copyISLAMABAD: The acute power crisis has compelled the Pakistan Electric Power Company (PEPCO) to resort to eight to 12 hours load-shedding in urban and rural areas.

A senior PEPCO official told APP on Sunday that annual canals closure for desalting, shortage of gas and furnace oil supply to power plants has significantly reduced generation capacity.

He said that the Indus River System Authority (IRSA) has reduced discharge of water from Tarbela and Mangla dams resulting decline in hydel power generation. Only 1100 MW hydel electricity is being generated from their power houses, he said.

Meanwhile, IRSA chairman Syed Mazhar Ali Shah told APP that canals have been closed under annual desalting programme and will be opened by January 30 next year.

He said that water discharge from Tarbela and Mangla dams have also been reduced and as on Sunday only 24,000 cusecs and 10,000 cusecs water respectively was released.

Mazhar Ali said that water indent is being gradually reduced and will be brought down to 10,000 to 15,000 cusecs water. He said that 80 per cent less water will be discharged due to annul canal closure, which will affect hydel power generation.

Replying to a question regarding water theft from Tarbela Dam, he said that no water had been stolen rather the WAPDA had discharged more water for generating hydel power.

According to data, water inflow and outflow in Tarbela Dam was recorded as 18,700 cusecs and 24,000 cusecs respectively on Sunday. Similarly, water inflow and outflow in Mangla Dam was 7,337 and 10,000 cusecs respectively.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed.