BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

KARACHI: Administrator Karachi Laeeq Ahmed on Wednesday reviewed the measures being taken by Karachi Metropolitan Corporation (KMC) in view of monsoon season. He said that drainage pumps and other machinery and vehicles have been arranged. 20 new pumps have been purchased for drainage.

The Administrator passed these remarks while addressing a meeting to review measures at City Warden Headquarters Gulshan-e-Iqbal here.

Senior Director Coordination Khalid Khan, Director General Works Shabih Ul Hasnain Zaidi, Chief Engineer Electrical and Mechanical Abbas Shah, Director City Warden Raja Rustam and other officers were also present on the occasion.

Ahmed said that existing 11 de-watering pumps, tractors, dumpers and master trucks have also been repaired so that as soon as it starts raining, these pumps will be delivered to the places in the city where drainage is required.

“It is hoped that the citizens will see a better situation during the rainy season this time as compared to previous years,” he added.

The Administrator said that in Karachi 12 heavy pumps will be installed at places where there is a possibility of accumulation of rain water in large quantities while 10 new pumps will be placed to draw water from underpasses and also in case of complaints from citizens.

He said that based on last year’s experience, preparations have been made for the monsoon season and every effort is being made to provide better facilities to the citizens.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.