AIRLINK 72.72 Increased By ▲ 3.52 (5.09%)
BOP 5.04 Increased By ▲ 0.14 (2.86%)
CNERGY 4.28 Increased By ▲ 0.02 (0.47%)
DFML 31.91 Increased By ▲ 0.66 (2.11%)
DGKC 79.65 Increased By ▲ 2.40 (3.11%)
FCCL 20.71 Increased By ▲ 0.71 (3.55%)
FFBL 34.85 Decreased By ▼ -0.15 (-0.43%)
FFL 9.35 Increased By ▲ 0.23 (2.52%)
GGL 9.86 Increased By ▲ 0.06 (0.61%)
HBL 113.20 Increased By ▲ 0.44 (0.39%)
HUBC 133.48 Increased By ▲ 0.44 (0.33%)
HUMNL 7.01 Increased By ▲ 0.06 (0.86%)
KEL 4.27 Increased By ▲ 0.04 (0.95%)
KOSM 4.40 Increased By ▲ 0.15 (3.53%)
MLCF 36.90 Increased By ▲ 0.30 (0.82%)
OGDC 134.40 Increased By ▲ 1.53 (1.15%)
PAEL 23.75 Increased By ▲ 1.11 (4.9%)
PIAA 24.84 Increased By ▲ 0.64 (2.64%)
PIBTL 6.54 Increased By ▲ 0.08 (1.24%)
PPL 118.75 Increased By ▲ 2.45 (2.11%)
PRL 26.23 Increased By ▲ 0.33 (1.27%)
PTC 13.20 Increased By ▲ 0.12 (0.92%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 69.55 Increased By ▲ 1.95 (2.88%)
SSGC 10.51 Decreased By ▼ -0.03 (-0.28%)
TELE 8.36 Increased By ▲ 0.08 (0.97%)
TPLP 11.24 Increased By ▲ 0.44 (4.07%)
TRG 58.95 Decreased By ▼ -0.34 (-0.57%)
UNITY 25.25 Increased By ▲ 0.12 (0.48%)
WTL 1.27 No Change ▼ 0.00 (0%)
BR100 7,455 Increased By 45.8 (0.62%)
BR30 24,321 Increased By 285.1 (1.19%)
KSE100 71,189 Increased By 522 (0.74%)
KSE30 23,333 Increased By 109.2 (0.47%)

PESHAWAR: KP Chief Minister Mahmood Khan Friday decided to hold ground breaking of the 300 megawatt Balakot Hydro Power Project and directed the authorities of Energy and Power Department to finalize all preparations and arrangements. He said, the ground breaking of the mega project is expected to be performed by Prime Minister, Imran Khan.

The decision was taken during a review meeting regarding preparations and arrangements made in connections with ground breaking of Blakot Hydro Power Project at Chief Minister’s Secretariat here.

Advisor to Chief Minister for Energy and Power Himayat Ullah Khan, Principal Secretary to Chief Minister Shahab Ali Shah, Secretary Energy and Power Zubair Khan, Chief Executive Officer PEDO and other relevant high ups attended the meeting.

The Chief Minister was briefed about the progress so far made on the said project and it was told that contract of project had been awarded while contract agreement would soon be signed with the contractor. The 300 Mega Watt Power project is being set up on Kunhar River in Mansehra district with the assistance of Asian Development Bank with an estimated cost of Rs. 85.00 billion.

Copyright Business Recorder, 2021

Comments

Comments are closed.