AGL 6.80 Increased By ▲ 0.08 (1.19%)
ANL 9.22 Decreased By ▼ -0.53 (-5.44%)
AVN 74.20 Decreased By ▼ -1.30 (-1.72%)
BOP 5.43 Decreased By ▼ -0.01 (-0.18%)
CNERGY 4.89 Decreased By ▼ -0.06 (-1.21%)
EFERT 78.00 Decreased By ▼ -0.05 (-0.06%)
EPCL 54.70 Decreased By ▼ -0.70 (-1.26%)
FCCL 14.93 Decreased By ▼ -0.37 (-2.42%)
FFL 6.34 Decreased By ▼ -0.14 (-2.16%)
FLYNG 7.12 Decreased By ▼ -0.03 (-0.42%)
GGGL 10.56 Increased By ▲ 0.01 (0.09%)
GGL 16.43 Decreased By ▼ -0.12 (-0.73%)
GTECH 8.21 Decreased By ▼ -0.21 (-2.49%)
HUMNL 6.35 Decreased By ▼ -0.06 (-0.94%)
KEL 2.95 Decreased By ▼ -0.04 (-1.34%)
LOTCHEM 28.60 Decreased By ▼ -0.25 (-0.87%)
MLCF 27.80 Decreased By ▼ -0.50 (-1.77%)
OGDC 75.30 Decreased By ▼ -0.20 (-0.26%)
PAEL 15.80 Increased By ▲ 0.26 (1.67%)
PIBTL 5.60 Increased By ▲ 0.24 (4.48%)
PRL 17.22 Decreased By ▼ -0.10 (-0.58%)
SILK 1.06 Increased By ▲ 0.01 (0.95%)
TELE 10.30 Decreased By ▼ -0.20 (-1.9%)
TPL 8.00 No Change ▼ 0.00 (0%)
TPLP 20.80 No Change ▼ 0.00 (0%)
TREET 22.60 Decreased By ▼ -0.40 (-1.74%)
TRG 128.85 Increased By ▲ 6.15 (5.01%)
UNITY 22.50 Decreased By ▼ -0.08 (-0.35%)
WAVES 12.00 Increased By ▲ 0.70 (6.19%)
WTL 1.13 Decreased By ▼ -0.01 (-0.88%)
BR100 4,100 Decreased By -4 (-0.1%)
BR30 15,533 Increased By 64.6 (0.42%)
KSE100 41,129 Increased By 114.8 (0.28%)
KSE30 15,337 Increased By 24.6 (0.16%)
Follow us

KARACHI: Administrator Karachi Laeeq Ahmed on Friday said construction work on Red Line Bus (RLB) project would start soon and will be completed within two years. Once completed, the project would help ease the transport woes of Karachiites, he said. The administrator was presiding over a meeting to review measures for Red Line Bus Rapid Transit System here at KMC building. The project’s CEO Wasiq Jalil, besides Senior Director Coordination KMC Khalid Khan, Director General Works Shabeeh ul Hassan Zaidi, Senior Director Culture, Sports and Recreation Mansoor Qazi, Director Land Tariq Siddiqui and other officials were also present on the occasion. The project has already been approved by ECNEC. The administrator said Red Line Bus Rapid Transit would be run from Malir to Numaish. Ahmed also passed directives for announcing alternate route plan to ensure smooth flow of traffic as the people may face difficulties due to the development works. The Administrator said that legal constructions on the project route would be compensated and resettled. He said under Red Line Bus Rapid Transit, 25,000 trees would be planted as well as the drainage system would also be replaced.

Copyright Business Recorder, 2021

kmc

Comments

Comments are closed.