AIRLINK 79.41 Increased By ▲ 1.02 (1.3%)
BOP 5.33 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.38 Increased By ▲ 0.05 (1.15%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 76.87 Decreased By ▼ -1.64 (-2.09%)
FCCL 20.53 Decreased By ▼ -0.05 (-0.24%)
FFBL 31.40 Decreased By ▼ -0.90 (-2.79%)
FFL 9.85 Decreased By ▼ -0.37 (-3.62%)
GGL 10.25 Decreased By ▼ -0.04 (-0.39%)
HBL 117.93 Decreased By ▼ -0.57 (-0.48%)
HUBC 134.10 Decreased By ▼ -1.00 (-0.74%)
HUMNL 7.00 Increased By ▲ 0.13 (1.89%)
KEL 4.67 Increased By ▲ 0.50 (11.99%)
KOSM 4.74 Increased By ▲ 0.01 (0.21%)
MLCF 37.44 Decreased By ▼ -1.23 (-3.18%)
OGDC 136.70 Increased By ▲ 1.85 (1.37%)
PAEL 23.15 Decreased By ▼ -0.25 (-1.07%)
PIAA 26.55 Decreased By ▼ -0.09 (-0.34%)
PIBTL 7.00 Decreased By ▼ -0.02 (-0.28%)
PPL 113.75 Increased By ▲ 0.30 (0.26%)
PRL 27.52 Decreased By ▼ -0.21 (-0.76%)
PTC 14.75 Increased By ▲ 0.15 (1.03%)
SEARL 57.20 Increased By ▲ 0.70 (1.24%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.09 Increased By ▲ 0.15 (1.37%)
TELE 9.23 Increased By ▲ 0.08 (0.87%)
TPLP 11.56 Decreased By ▼ -0.11 (-0.94%)
TRG 72.10 Increased By ▲ 0.67 (0.94%)
UNITY 24.82 Increased By ▲ 0.31 (1.26%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
BR100 7,526 Increased By 32.9 (0.44%)
BR30 24,650 Increased By 91.4 (0.37%)
KSE100 71,971 Decreased By -80.5 (-0.11%)
KSE30 23,749 Decreased By -58.8 (-0.25%)
Pakistan

Resuming operation: PR issues KCR's train schedule

  • On Nov 19, the first train will depart from Orangi railway station at 6:30 am for up track while the local train on down track will depart from Marshalling Yard Pipri railway station at 7:00 am
Published November 17, 2020

(Karachi) Pakistan Railways has issued the schedule of Karachi Circular Railway (KCR) that is set to resume operations from November 19, local media reported.

As per details, the first train will depart from Orangi railway station at 6:30 am for up track while the local train on down track will depart from Marshalling Yard Pipri railway station at 7:00 am. The railway administration has decided to run each train from both stations after every three hours.

In addition, the train will stop at Manghopir, SITE, Shah Abdul Latif, Baldia, Lyari, Wazir Mansion, Karachi City Station, Karachi Cantt Station, Departure Yard, Drigh Road, Drigh Colony, Airport, Malir Colony, Malir, Landhi, Jumma Goth, Bin Qasim and Baldia Nullah before reaching Marshalling Yard Pipri railway station at 9:15 am.

Similarly, the second train will leave the Orangi railway station at 10:00 am; third at 01:00 pm and fourth at 04:00 pm.

For the down track, the local train will depart from Marshalling Yard railway station at 07:00 am, covering the same stops to reach Orangi railway station at 09:45 am.

The second train will leave the Marshalling Yard railway station at 09:30 am; third at 01:00 pm and fourth at 04:30 pm. The fare of the train was fixed up to Rs50 for the one-sided journey.

Earlier, a KCR train comprising four bogies and two locomotives travelled a 14-kilometre-long distance from Karachi’s City Railway Station to Orangi Town.

The train took around two hours to cover the entire distance that was supposed to take minutes, they said, adding it took much longer than usual because of the dilapidated condition of the tracks and stations.

The KCR project is 12.63 kilometer at grade (on the ground), and 30.75 kilometer elevated with 24 railway stations out of which 14 will be elevated. The average distance between each station will be 1.8 kilometre.

Comments

Comments are closed.