BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

power-line0ISLAMABAD: President Pakistan Businessmen and Intellectuals Forum (PBIF), Mian Zahid Hussain said that rehabilitation of operational power plants could increase electricity generation by one hundred percent without any additional cost.

Decision of constructing dozens of power plants is good but the older ones should also be given attention as their proper maintenance is not very costly, he said.

Mian Zahid Hussain said that water storage capacity should be increased and hydel projects should be initiated without any further delay, he said in a statement issued here on Monday.

He was of the view that unnecessary delay in construction of dams has increased dependence on imported oil which has left country open to oil price shocks.

A claimed that a foreign experts has proposed to construct Chiniot dam in 1959 which would have generated 60 megawatt of electricity resulting in profit of Rs. 5 billion per annum and countered the floods resulting in losses to the tune of billions to the rural economy but the proposal was neither accepted nor rejected.

Increasing population requires government to take steps to increase water availability and storage otherwise people will have to face food security problem, he observed.

Copyright APP (Associated Press of Pakistan), 2017
 

Comments

Comments are closed for this article.