BR100 Decreased By (-0.88%)
BR30 Decreased By (-0.81%)
KSE100 Decreased By (-0.74%)
KSE30 Decreased By (-0.73%)
AGHA 7.41 Decreased By ▼ -0.15 (-1.98%)
BECO 5.11 Increased By ▲ 0.02 (0.39%)
BML 55.48 Increased By ▲ 0.50 (0.91%)
BOP 32.25 Decreased By ▼ -0.73 (-2.21%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.02 Decreased By ▼ -0.11 (-2.14%)
FCCL 51.30 Increased By ▲ 0.05 (0.1%)
FFL 15.90 Decreased By ▼ -0.28 (-1.73%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.12 Increased By ▲ 0.06 (0.85%)
KOSM 5.37 Decreased By ▼ -0.17 (-3.07%)
LOTCHEM 26.54 Decreased By ▼ -2.58 (-8.86%)
MLCF 86.96 Decreased By ▼ -1.86 (-2.09%)
NBP 192.29 Decreased By ▼ -5.20 (-2.63%)
NCPL 55.31 Increased By ▲ 0.29 (0.53%)
NPL 65.45 Increased By ▲ 0.57 (0.88%)
OGDC 311.95 No Change ▼ 0.00 (0%)
PACE 10.35 Increased By ▲ 0.14 (1.37%)
PAEL 40.50 Decreased By ▼ -0.49 (-1.2%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.00 Decreased By ▼ -0.66 (-0.31%)
PRL 52.68 Increased By ▲ 0.14 (0.27%)
PTC 68.00 Decreased By ▼ -1.08 (-1.56%)
SSGC 24.74 Decreased By ▼ -0.36 (-1.43%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.24 Decreased By ▼ -0.08 (-0.96%)
TPL 17.80 Increased By ▲ 0.05 (0.28%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.14 Decreased By ▼ -0.60 (-2.76%)
TRG 59.61 Increased By ▲ 2.72 (4.78%)

power-line0ISLAMABAD: President Pakistan Businessmen and Intellectuals Forum (PBIF), Mian Zahid Hussain said that rehabilitation of operational power plants could increase electricity generation by one hundred percent without any additional cost.

Decision of constructing dozens of power plants is good but the older ones should also be given attention as their proper maintenance is not very costly, he said.

Mian Zahid Hussain said that water storage capacity should be increased and hydel projects should be initiated without any further delay, he said in a statement issued here on Monday.

He was of the view that unnecessary delay in construction of dams has increased dependence on imported oil which has left country open to oil price shocks.

A claimed that a foreign experts has proposed to construct Chiniot dam in 1959 which would have generated 60 megawatt of electricity resulting in profit of Rs. 5 billion per annum and countered the floods resulting in losses to the tune of billions to the rural economy but the proposal was neither accepted nor rejected.

Increasing population requires government to take steps to increase water availability and storage otherwise people will have to face food security problem, he observed.

Copyright APP (Associated Press of Pakistan), 2017
 

Comments

Comments are closed for this article.