BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.06%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.81 Decreased By ▼ -0.17 (-0.31%)
BOP 33.13 Increased By ▲ 0.15 (0.45%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.14 Increased By ▲ 0.01 (0.19%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.86 Increased By ▲ 0.32 (5.78%)
LOTCHEM 27.17 Decreased By ▼ -1.95 (-6.7%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.70 Increased By ▲ 0.68 (1.24%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.78 Increased By ▲ 1.83 (0.59%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.25 Increased By ▲ 0.26 (0.63%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 213.83 Increased By ▲ 1.17 (0.55%)
PRL 54.15 Increased By ▲ 1.61 (3.06%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.16 Increased By ▲ 0.06 (0.24%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.41 Decreased By ▼ -0.33 (-1.52%)
TRG 59.98 Increased By ▲ 3.09 (5.43%)

imageLAHORE: Pakistan Water and Power Development Authority (WAPDA) Chairman Lt Gen (R) Muzammil Hussain on Monday urged the project management to put in their maximum to complete the 1410 MW-Tarbela 4th Extension Hydropower Project as early as possible.

During his visit to Tarbela 4th Extension Hydropower Project, he said that besides accelerating the pace of work, the stipulated quality standards must be adhered in letter and spirit for completion of the project. "Energy and water availability being most critical need will improve after completion of the projects underway," he asserted.

Discussion during the visit with the project authorities, consultants and contractors were aimed at tuning the timelines for completion of Tarbela 4th Extension Hydropower Project.

Tarbela Project was being constructed on tunnel No.4 of Tarbela Dam and it would increase generation capacity of Tarbela Hydel Power Station from 3478 MW to 4888 MW, after installation of three units with installed capacity of 470 MW each.

Earlier, WAPDA Chairman Lt Gen (R) Muzammil Hussain visited WAPDA Cadet College, Tarbela and viewed the facilities being provided to students with regard to curricular and co-curricular activities.

He also discussed with college administration the ways and means to improve those facilities for imparting quality education and building characters of the college students.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.