AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)

imageLAHORE: Lahore Chamber of Commerce & Industry (LCCI) on Monday urged the Lahore Electric Supply Company (LESCO) to resolve the issues of tripping and low voltage at Ferozepur Road Industrial Area.

The LCCI President Sheikh Muhammad Arshad made this demand in a meeting with a delegation of Ferozepur Road Industrial Association (FRIA) led by its Chairman Khawaja Shahzeb Akram here. Adnan Khalid Butt and Arshad Baig were prominent among other members of the delegation.

The delegation informed the LCCI president that tripping and unscheduled loadshedding was damaging the industrial activities in the Ferozepur Road Industrial area.

After listening to their point of view, Sheikh Muhammad Arshad said that the industry needed a continuous supply of electricity to keep the units operational and complete the export orders well within the given timeframe.

He said that cheaper and uninterrupted power supply was the only way to achieve economic targets set for the year 2016-17.

The LCCI President said that Ferozepur Road Industrial Area was facing tripping, low voltage and unscheduled loadshedding, therefore LESCO should resolve this issue at the earliest.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.