BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.06%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.81 Decreased By ▼ -0.17 (-0.31%)
BOP 33.13 Increased By ▲ 0.15 (0.45%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.14 Increased By ▲ 0.01 (0.19%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.85 Increased By ▲ 0.31 (5.6%)
LOTCHEM 27.10 Decreased By ▼ -2.02 (-6.94%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 197.00 Decreased By ▼ -0.49 (-0.25%)
NCPL 55.78 Increased By ▲ 0.76 (1.38%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.85 Increased By ▲ 1.90 (0.61%)
PACE 10.44 Increased By ▲ 0.23 (2.25%)
PAEL 41.35 Increased By ▲ 0.36 (0.88%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 214.00 Increased By ▲ 1.34 (0.63%)
PRL 54.25 Increased By ▲ 1.71 (3.25%)
PTC 70.00 Increased By ▲ 0.92 (1.33%)
SSGC 25.15 Increased By ▲ 0.05 (0.2%)
TBL 9.65 Increased By ▲ 0.03 (0.31%)
TELE 8.36 Increased By ▲ 0.04 (0.48%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.14 Decreased By ▼ -0.08 (-0.61%)
TREET 21.47 Decreased By ▼ -0.27 (-1.24%)
TRG 59.89 Increased By ▲ 3.00 (5.27%)
Pakistan

Work on 2MW power project starts in Hunza

Published Updated

imageISLAMABAD: Work on two megawatt hydel power project at Hassanabad has been initiated in Hunza.

The project costing Rs 350 million would be completed in the next three years, Radio Pakistan reported.

Power department sources said that two kilometer road from Karakorum Highway to project site would also constructed.

The project would help to minimize load shedding in the district.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.