BR100 Increased By (0.55%)
BR30 Increased By (0.73%)
KSE100 Increased By (0.1%)
KSE30 Increased By (0.13%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 55.00 Increased By ▲ 0.02 (0.04%)
BOP 32.86 Decreased By ▼ -0.12 (-0.36%)
CNERGY 10.36 Increased By ▲ 0.26 (2.57%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.59 Increased By ▲ 0.41 (2.53%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.85 Increased By ▲ 0.31 (5.6%)
LOTCHEM 27.10 Decreased By ▼ -2.02 (-6.94%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 197.00 Decreased By ▼ -0.49 (-0.25%)
NCPL 55.78 Increased By ▲ 0.76 (1.38%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.85 Increased By ▲ 1.90 (0.61%)
PACE 10.44 Increased By ▲ 0.23 (2.25%)
PAEL 41.35 Increased By ▲ 0.36 (0.88%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 214.00 Increased By ▲ 1.34 (0.63%)
PRL 54.25 Increased By ▲ 1.71 (3.25%)
PTC 70.00 Increased By ▲ 0.92 (1.33%)
SSGC 25.15 Increased By ▲ 0.05 (0.2%)
TBL 9.65 Increased By ▲ 0.03 (0.31%)
TELE 8.36 Increased By ▲ 0.04 (0.48%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.14 Decreased By ▼ -0.08 (-0.61%)
TREET 21.47 Decreased By ▼ -0.27 (-1.24%)
TRG 59.89 Increased By ▲ 3.00 (5.27%)

imageMULTAN: Multan Electric Power Company (MEPCO) have completed 273 low tension (LT) schemes in the region during the year 2015-16.

According to Mepco office sources on Monday, these 273 low tension schemes have been completed with a cost of Rs 192 millions to provide new connections to consumers and expansion of distribution system.

In line with special directions of CEO Mepco Engineer Fazal Ullah Durani, 49 LT schemes were completed in July 2015, 28 in August, 27 in September, 11 in October, 11 in November, 40 in December, 24 in January 2016, 49 in February, 21 in March and 13 LT schemes were completed in April 2016.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.