AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)
Pakistan

Power shortfall jumps to 3,569 MW

ISLAMABAD : The electricity shortfall in the country on Saturday again jumped to 3,569 MW from 2,443 MW as the total pow
Published August 20, 2011

 ISLAMABAD: The electricity shortfall in the country on Saturday again jumped to 3,569 MW from 2,443 MW as the total power generation was recorded as 14,911 MW against the demand of 18,480 MW during the last 24 hours.

According to a briefing on daily power generation and load-management position, the hydel generation stood at 6,107 MW, WAPDA thermal 1,817 MW, IPPs 6,107 MW and rental 154 MW.

As many as 680 MW was supplied to Karachi Electric Supply Company (KESC), the report added.

Water level at Tarbela and Mangla dams was recorded as 1538.68 feet and 1202.10 feet with water discharge of 80,000 and 13,000 cusecs respectively.

The hydel generation witnessed significantly increase and stood at 6,107 MW owing to increase water inflow in rivers.

 

Copyright APP (Associated Press of Pakistan), 2011

 

Comments

Comments are closed.