AIRLINK 75.85 Increased By ▲ 0.42 (0.56%)
BOP 5.13 Increased By ▲ 0.06 (1.18%)
CNERGY 4.64 Decreased By ▼ -0.11 (-2.32%)
DFML 32.20 Increased By ▲ 2.10 (6.98%)
DGKC 88.63 Decreased By ▼ -1.85 (-2.04%)
FCCL 22.66 Decreased By ▼ -0.24 (-1.05%)
FFBL 33.16 Increased By ▲ 0.21 (0.64%)
FFL 10.04 Decreased By ▼ -0.01 (-0.1%)
GGL 11.30 Decreased By ▼ -0.04 (-0.35%)
HBL 114.50 Increased By ▲ 1.01 (0.89%)
HUBC 137.05 Increased By ▲ 0.54 (0.4%)
HUMNL 9.52 Decreased By ▼ -0.38 (-3.84%)
KEL 4.62 Decreased By ▼ -0.04 (-0.86%)
KOSM 4.71 Increased By ▲ 0.02 (0.43%)
MLCF 40.45 Decreased By ▼ -0.65 (-1.58%)
OGDC 137.48 Increased By ▲ 2.68 (1.99%)
PAEL 27.20 Decreased By ▼ -0.41 (-1.48%)
PIAA 24.73 Decreased By ▼ -0.74 (-2.91%)
PIBTL 6.94 Increased By ▲ 0.02 (0.29%)
PPL 124.80 Increased By ▲ 0.35 (0.28%)
PRL 27.70 Increased By ▲ 0.30 (1.09%)
PTC 14.25 Decreased By ▼ -0.25 (-1.72%)
SEARL 61.00 Increased By ▲ 0.80 (1.33%)
SNGP 71.75 Increased By ▲ 1.20 (1.7%)
SSGC 10.58 Increased By ▲ 0.02 (0.19%)
TELE 8.81 Decreased By ▼ -0.08 (-0.9%)
TPLP 11.72 Decreased By ▼ -0.06 (-0.51%)
TRG 66.80 Decreased By ▼ -0.86 (-1.27%)
UNITY 25.18 Increased By ▲ 0.01 (0.04%)
WTL 1.45 Decreased By ▼ -0.03 (-2.03%)
BR100 7,780 Increased By 55.8 (0.72%)
BR30 25,672 Increased By 71.1 (0.28%)
KSE100 74,333 Increased By 533.5 (0.72%)
KSE30 23,894 Increased By 270 (1.14%)

imageISLAMABAD: Pakistan Railways will float an international tender for the procurement of 32 locomotives to improve its services for passengers.

The locomotives will be partially assembled at Pakistan Locomotive Factory Risalpur, an official in the Ministry of Railways told APP.

He said a contract has been signed for manufacturing of five diesel powered locomotives at the Locomotive Factory. The supply of material and kits for the assembling of these locomotives will be received by May this year.

The official said that efforts were also being made to prepare a business model to enhance the productivity of Risalpur Locomotive Factory.

All the pre-requisites of Japan International Cooperation Agency have been fulfilled to secure financial assistance for Karachi Circular Railway Project, he added.

He said feasibility as well as social, environmental and engineering studies of the project have already been completed.

The official expressed the hope that the project will be completed within tenure of the present government.

Comments

Comments are closed.