BR100 Decreased By (-0.55%)
BR30 Decreased By (-1.17%)
KSE100 Decreased By (-0.5%)
KSE30 Decreased By (-0.47%)
AGHA 6.70 Increased By ▲ 0.02 (0.3%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 56.40 Decreased By ▼ -0.92 (-1.61%)
BOP 30.08 Decreased By ▼ -0.27 (-0.89%)
CNERGY 12.97 Decreased By ▼ -0.15 (-1.14%)
CSIL 5.33 Decreased By ▼ -0.08 (-1.48%)
FCCL 52.10 Decreased By ▼ -0.69 (-1.31%)
FFL 14.54 Decreased By ▼ -0.18 (-1.22%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.11 Increased By ▲ 0.02 (0.33%)
KOSM 5.96 Increased By ▲ 0.23 (4.01%)
LOTCHEM 26.20 Decreased By ▼ -0.26 (-0.98%)
MLCF 91.45 Decreased By ▼ -1.71 (-1.84%)
NBP 163.89 Decreased By ▼ -0.77 (-0.47%)
NCPL 53.62 Decreased By ▼ -2.04 (-3.67%)
NPL 58.89 Decreased By ▼ -2.27 (-3.71%)
OGDC 314.00 Decreased By ▼ -2.73 (-0.86%)
PACE 9.82 Decreased By ▼ -0.05 (-0.51%)
PAEL 35.15 Decreased By ▼ -0.48 (-1.35%)
PIBTL 14.77 Increased By ▲ 0.09 (0.61%)
PPL 222.48 Decreased By ▼ -4.43 (-1.95%)
PRL 91.11 Decreased By ▼ -1.91 (-2.05%)
PTC 59.20 Decreased By ▼ -1.06 (-1.76%)
SSGC 23.24 Decreased By ▼ -0.57 (-2.39%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.59 Decreased By ▼ -0.21 (-2.69%)
TPL 22.02 Decreased By ▼ -0.33 (-1.48%)
TPLP 12.60 Decreased By ▼ -0.37 (-2.85%)
TREET 21.85 Decreased By ▼ -0.31 (-1.4%)
TRG 56.27 Decreased By ▼ -0.29 (-0.51%)
Pakistan

IP gas project will boost industrial sector

Published Updated

imageISLAMABAD: Iran-Pakistan (IP) gas pipeline project must be completed before 2015 while coal reserves must be utilized to overcome the energy crisis, says expert.

Talking to Radio Pakistan, Energy sector expert Dr. Gul Faraz said that the government can overcome the energy crisis by developing people-friendly policies.

"Public policies succeed only in case if people become part of those policies after finding them beneficial", he added.

He added that the elected governments prioritize the basic needs of common people while making policies.

He further said that gas in Pakistan is not sufficient for the needs of the country and IP gas pipeline will be a boost for industrial sector.

Gul Faraz said that steps should be taken on emergency basis and that is the only way to handle the crisis.

He said that provision of gas to industrial sector has been suspended in winter season for the last two or three years but now this practice should be changed.

"Supply of gas to industrial sector should be ensured to increase production" he said.

He added that the government should take steps on emergency basis to complete the IP gas pipeline project because Pakistan will have to pay a fine according to international laws if the project was not completed in the proposed time.

He was of the view that provision of gas to industrial sector will lead to an increase in production and subsequently a rise in national income will be a bonus.

Comments

Comments are closed for this article.