BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)

LAHORE: The National Transmission and Despatch Company (NTDC) has successfully conducted its first-ever live-line maintenance on the crucial ±660 kV Matiari-Lahore HVDC transmission line, a flagship project under the China-Pakistan Economic Corridor (CPEC).

According to sources, the operation was performed on Tower 1885 Lahore while the system remained fully energised, ensuring no disruption to the national grid, the state-run utility.

According to Gwadar Pro the project, located near Lahore, Tower 1885 forms part of the northern section of the 878-kilometer HVDC corridor that transmits up to 4,000 MW of electricity from Matiari in Sindh to Lahore in Punjab.

Underutilization of HVDC line: AGP holds NGC responsible for Rs86.5bn overcharge

“The tower’s maintenance under live conditions demonstrates the company’s readiness to handle complex technical interventions without suspending the line’s operations, an essential capability for sustaining grid reliability,” an NTDC official stated.

Dr Rana Abdul Jabbar Khan, General Manager (HVDC), who supervised the activity, commended the crew for their “exceptional professionalism, teamwork, adherence to safety protocols and dedication.”

The Matiari-Lahore line, Pakistan’s first HVDC project, was executed by China Electric Power Equipment and Technology Co., Ltd. (CET) and sponsored by the State Grid Corporation of China (SGCC).

It plays a vital role in stabilising the country’s power distribution network and reducing transmission losses.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.