BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)

KARACHI: K-Electric (KE) continues its efforts against electricity theft and unpaid bills. With the support of law-enforcement agencies, the power utility carried out an anti-theft drive in Gadap, removing 645 illegal connections (kundas), weighing a total of 800 kilograms.

These illegal connections were involved in theft of 1.8 million units of electricity per month, causing disruptions in appropriate supply of power distribution along the Superhighway.

The kunda connections used for electricity theft were installed by evading the safety protocols of the network. These illegal connections pose significant risks to KE’s infrastructure, as well as, the public at large.

Electricity theft and non-payment of bills are the two key factors that determine the loss profile of any area.

Meanwhile, due to elevated efforts, losses on 11kV feeders energising the M-9 Corridor have significantly declined, contributing to a more stable and financially secure power distribution network.

The efforts have revolved around eliminating illegal connections, improving the network, and ensuring a steady electricity supply. Spanning an extensive 04 x kilometres longitudinal stretch, the initiative focuses on stable power utility without any interruption serving the community along M9 — including prestigious educational institutes, corporate establishments, and residential communities.

This mammoth project marks a turning point for power distribution for residents of Karachi.

KE also remains committed to protecting its infrastructure and maintaining the network stability of load shed exemption to 70% areas by continuing its efforts to reduce losses in the remaining areas and ensuring reliable and safe electricity supply for all. Areas with lower losses experience little to no load shedding, highlighting the benefits of responsible electricity use and timely bill payments.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.