BR100 Increased By (1.45%)
BR30 Increased By (1.45%)
KSE100 Increased By (1.26%)
KSE30 Increased By (1.32%)
AGHA 7.85 Increased By ▲ 0.10 (1.29%)
BECO 5.21 Increased By ▲ 0.02 (0.39%)
BML 58.96 Increased By ▲ 0.30 (0.51%)
BOP 34.42 Increased By ▲ 0.73 (2.17%)
CNERGY 10.94 Increased By ▲ 0.33 (3.11%)
CSIL 5.45 Increased By ▲ 0.15 (2.83%)
FCCL 54.80 Increased By ▲ 1.06 (1.97%)
FFL 16.76 Increased By ▲ 0.30 (1.82%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.46 Increased By ▲ 0.18 (2.47%)
KOSM 5.68 Increased By ▲ 0.04 (0.71%)
LOTCHEM 29.95 Increased By ▲ 0.30 (1.01%)
MLCF 96.90 Increased By ▲ 0.54 (0.56%)
NBP 206.00 Increased By ▲ 2.47 (1.21%)
NCPL 58.00 Increased By ▲ 1.15 (2.02%)
NPL 69.00 Increased By ▲ 1.69 (2.51%)
OGDC 321.01 Increased By ▲ 2.79 (0.88%)
PACE 10.67 Increased By ▲ 0.04 (0.38%)
PAEL 43.27 Increased By ▲ 1.50 (3.59%)
PIBTL 17.13 Increased By ▲ 0.32 (1.9%)
PPL 223.21 Increased By ▲ 3.04 (1.38%)
PRL 52.45 Increased By ▲ 3.40 (6.93%)
PTC 71.18 Increased By ▲ 1.17 (1.67%)
SSGC 29.70 Increased By ▲ 0.56 (1.92%)
TBL 9.93 Increased By ▲ 0.16 (1.64%)
TELE 8.95 Increased By ▲ 0.13 (1.47%)
TPL 17.84 Increased By ▲ 0.67 (3.9%)
TPLP 13.16 Increased By ▲ 0.65 (5.2%)
TREET 22.92 Increased By ▲ 0.33 (1.46%)
TRG 60.65 Increased By ▲ 0.43 (0.71%)

LAHORE: Wapda is all set for diversion of Swat River at Mohmand Dam Hydropower Project as the diversion tunnels have been completed. The project team is likely to divert River Swat partially after completion of the river-closure-dyke in a few days. Despite high flow season full effort is being made to achieve this significant milestone.

With this significant development in the offing coupled with other multiple construction activities going on at the project, Chairman Wapda Engr. Lt Gen Sajjad Ghani (retd) visited Mohmand Dam Hydropower Project and reviewed construction progress on the project.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.