BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

LAHORE: The caretaker Chief Minister Punjab Mohsin Naqvi on Monday conducted inspection of the ongoing ‘Controlled Access Corridor’ project’ on Band Road, which is poised to yield substantial savings both in terms of time and fuel, benefiting the economy significantly.

He assessed the progress of this significant endeavour, spanning from Niazi Chowk to Babu Sabu. He underscored the importance of ensuring smooth traffic flow on the closed road throughout the construction phase.

He emphasized that the Chief Traffic Officer (CTO) should personally oversee operations and recommended deploying additional traffic wardens.

The CM also ordered the relocation of street lights and poles from the closed roads. He directed that the poles be removed and repurposed elsewhere. He set forth a clear directive for the timely completion of the controlled access corridor project.

The CM received a comprehensive briefing, underscoring the round-the-clock efforts being made to complete the 7.3 km long controlled access corridor within four months.

The project encompasses two packages, with Package One spanning 3.65 km from Niazi to Sagian Interchange, and Package Two covering an equivalent distance from Sagian to Babu Sabu Interchange.

Moreover, the CM met with the British Parliament Member Khalid Mehmood and exchanged matters of mutual interest besides exploring avenues to address the concerns of overseas Pakistanis.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.