BR100 Increased By (0.84%)
BR30 Increased By (1.14%)
KSE100 Increased By (0.57%)
KSE30 Increased By (0.58%)
BECO 5.99 Increased By ▲ 0.22 (3.81%)
BML 53.30 Increased By ▲ 0.30 (0.57%)
BOP 34.39 Increased By ▲ 0.40 (1.18%)
CNERGY 8.13 Increased By ▲ 0.02 (0.25%)
DCL 12.35 Increased By ▲ 0.15 (1.23%)
FCCL 53.52 Increased By ▲ 0.69 (1.31%)
FCSC 5.19 Increased By ▲ 0.12 (2.37%)
FFL 18.07 Increased By ▲ 0.12 (0.67%)
FNEL 1.31 Increased By ▲ 0.02 (1.55%)
HUMNL 10.84 Decreased By ▼ -0.04 (-0.37%)
KEL 8.12 Increased By ▲ 0.10 (1.25%)
KOSM 5.50 Decreased By ▼ -0.02 (-0.36%)
MLCF 87.54 Increased By ▲ 1.03 (1.19%)
NBP 186.81 Increased By ▲ 1.65 (0.89%)
PACE 10.70 Increased By ▲ 0.12 (1.13%)
PAEL 40.15 Increased By ▲ 0.73 (1.85%)
PIAHCLA 26.18 Decreased By ▼ -0.04 (-0.15%)
PIBTL 17.10 Increased By ▲ 0.43 (2.58%)
PPL 229.50 Increased By ▲ 1.32 (0.58%)
PRL 34.93 Increased By ▲ 0.25 (0.72%)
PTC 67.98 Increased By ▲ 2.65 (4.06%)
SEARL 91.36 Increased By ▲ 1.23 (1.36%)
SSGC 26.81 Increased By ▲ 0.21 (0.79%)
TELE 8.72 Increased By ▲ 0.44 (5.31%)
THCCL 59.15 Increased By ▲ 0.65 (1.11%)
TPLP 8.67 Increased By ▲ 0.45 (5.47%)
TREET 24.70 Increased By ▲ 0.17 (0.69%)
TRG 70.00 Increased By ▲ 0.29 (0.42%)
WAVES 10.10 Increased By ▲ 0.16 (1.61%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

LAHORE: Federal Minister for Energy (Power Division), Engr Khurram Dastgir Khan inaugurated 220kV grid station Jhimpir-II at Jhimpir in District Thatta Wednesday. The project will add power to the national grid generated through wind power plants located in Jhimpir wind cluster.

Addressing the inauguration ceremony, Engr Khurram Dastgir Khan said that the major focus of the present government is to utilize indigenous sources of energy to lessen the reliance on expensive, imported fuel for the generation of electricity.

He said that major focus is being given to electricity generation through solar, wind, hydel and nuclear, which are not only cost-effective but also environment friendly. He further said that, in addition to this clean energy being injected into the system, the transmission system is also being strengthened.

The grid station and its allied transmission lines were completed at the cost of Rs8,250 million and will evacuate 510 MW of clean renewable energy from wind power plants located in the Jhimpir wind corridor.

The Managing Director NTDC, Engr Dr Rana Abdul Jabbar Khan also spoke on the occasion and said that the grid station will have sufficient capacity to transmit additional power in the future. It will also strengthen the reliability of the NTDC transmission network and improve voltage profile in the associated HESCO region. Local politicians, NTDC officers and staff were also present during the inauguration ceremony.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.