BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

KARACHI: Lasbela Chamber of Commerce and Industry conducted an urgent meeting of the executive committee to discuss the emergency situation occurred due to the heavy rains/ flood and the collapse of the bridge connecting Hub and Karachi.

Massive electric shut down due to the colossal damage caused by the flood water passing through Hub River which swiped away the power grid pylons.

Lasbela Chamber has been drawing the attention of the National Highway Authority to the condition monitoring of this important Bridge and had demanded the construction of the new bridge to cater to the requirement of heavy traffic using this bridge on N-25 to go to Balochistan from Karachi.

Lasbela Chamber has demanded to construct the new bridge on war footings and this time the bridge must be wide enough for the light and heavy traffic passing through it round the clock.

Chamber drew the attention of the provincial government that in the current situation all the traffic has been diverted towards the Hub Bypass.

The by-pass and its bridge are also not wide enough to fulfil the need of traffic volume that is passing through it. Urgent measures must be started to widen the by-pass and its bridge. It is crucially important to ensure the smooth flow of traffic is assured.

Chamber also suggested that as an alternate route from Karachi to Hub, the Sakran Road to which Commuters can approach from Humdard University must be repaired An encroachment must be removed to make it able to be used by heavy and light traffic till the new bridge is constructed on N-25.

The Executive Committee had urged that K-Electric must take urgent steps to restore the power in the industrial and residential areas of Hub to save the country from the loss of millions of rupees to the country due to the shutdown of industrial activity. The meeting was attended by Ismail Suttar and Yakoob Karim, ex-president of LCCI and other members of executive committee.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.